X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134050805000

Well Details

Well ID: 0134050805000
Loading map...
Location: 00/05-08-013-05W4/0
Location Alias: 00/05-08-13-05 W4M
Location Alias 2: 00/05-08-013-05 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 05
Section: 08
County/Municipality: Medicine Hat
Well Name: AECOG MEDHAT 5-8-13-5
Operator Name: Enerplus Corporation
License Number: 0143710
License Date: 1990-03-13
License Status: Suspension
Spud Date: 1990-03-27
Final Drill Date: 1990-03-30
Well Total Depth: 870.00 m
Surface Hole Latitude: 50.068909
Surface Hole Longitude: -110.664719

For data sources see[1][2]

Well History

Date Event
1990-03-13 Obtained License
1990-03-27 Surface Casing Operation Performed
1990-03-28 Direction Drilling Operation Performed - Deviate
1990-03-30 Finished Drilling
1990-03-30 Well Log Performed
1990-03-30 Well Mode changed to Drilled and Cased
1990-03-31 Production Casing Operation Performed
1990-03-31 Rig Released
1990-03-31 Well Log Performed
1990-04-11 Well Log Performed
1990-04-14 Well Log Performed
1990-04-15 Perforation Treatment Performed - Jet Perforation
1990-04-30 Well Began Production
1990-04-30 Well Fluid changed to Crude Oil
1990-04-30 Well Mode changed to Pumping
1999-11-01 Well Fluid changed to Crude Oil
1999-11-01 Well Mode changed to Suspended
2010-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-30 Plug Back Performed
2010-01-30 Well Fluid changed to Crude Oil
2010-01-30 Well Mode changed to Abandoned Zone
2010-02-03 Well Log Performed
2010-08-22 Perforation Treatment Performed - Jet Perforation
2010-08-22 Well Log Performed
2010-08-27 Perforation Treatment Performed - Cement Plug
2010-08-28 Perforation Treatment Performed - Jet Perforation
2010-08-28 Well Log Performed
2015-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-05-12 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-03-28 394.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-04-15 Perforation 836.00 839.50 13
2010-08-28 Perforation 694.00 698.00 17
2015-05-12 Packing Device Capped w/Cement 648.00 656.00 0
1990-04-15 Perforation 840.40 841.30 13
1990-04-15 Perforation 842.20 842.70 13
1990-04-15 Perforation 843.30 845.70 13
2010-01-30 Packing Device Capped w/Cement 819.70 827.70 0
2010-08-22 Perforation 665.00 669.00 17
2010-08-27 Cement Plug 740.80 815.40 0
2010-08-28 Perforation 669.00 671.00 17
2010-08-28 Perforation 689.00 691.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 5785 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 7385 0.0 0.0 0.0
1993 8721 0.0 0.0 0.0
1994 8719 0.0 0.0 0.0
1995 8657 0.0 0.0 0.0
1996 5229 0.0 0.0 0.0
1998 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References