X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134050104000

Well Details

Well ID: 0134050104000
Loading map...
Location: 00/04-01-013-05W4/0
Location Alias: 00/04-01-13-05 W4M
Location Alias 2: 00/04-01-013-05 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 05
Section: 01
County/Municipality: Cypress County
Well Name: CITY OF MEDH 6-1 MEDHAT 4-1-13-5
Operator Name: City Of Medicine Hat
License Number: 0435042
License Date: 2011-07-12
License Status: Issued
Spud Date: 2011-08-26
Final Drill Date: 2011-08-28
Well Total Depth: 695.00 m
Surface Hole Latitude: 50.051634
Surface Hole Longitude: -110.566839

For data sources see[1][2]

Well History

Date Event
2011-07-12 Obtained License
2011-08-27 Surface Casing Operation Performed
2011-08-28 Finished Drilling
2011-08-28 Production Casing Operation Performed
2011-08-28 Rig Released
2011-08-28 Well Mode changed to Drilled and Cased
2011-09-16 Well Log Performed
2011-09-21 Well Log Performed
2012-01-13 Perforation Treatment Performed - Jet Perforation
2012-01-13 Well Log Performed
2012-02-07 Perforation Treatment Performed - Cement Squeeze
2012-02-22 Perforation Treatment Performed - Jet Perforation
2012-02-22 Well Log Performed
2012-02-26 Perforation Treatment Performed - Fractured
2012-09-24 Well Began Production
2012-09-24 Well Fluid changed to Gas
2012-09-24 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-13 Perforation 215.00 217.00 20
2012-02-22 Perforation 495.00 496.00 7
2012-02-22 Perforation 444.50 445.50 7
2012-02-22 Perforation 419.00 420.00 7
2012-02-22 Perforation 406.50 407.50 7
2012-02-22 Perforation 362.00 363.00 7
2012-02-22 Perforation 352.00 353.00 7
2012-02-22 Perforation 344.00 345.00 7
2012-02-22 Perforation 319.50 320.00 7
2012-02-22 Perforation 305.00 306.00 7
2012-02-22 Perforation 293.00 294.00 7
2012-02-07 Cement Squeeze 215.00 217.00 0
2012-02-26 Fracture 651.50 653.50 0
2012-02-26 Fracture 640.00 641.00 0
2012-02-26 Fracture 597.50 598.50 0
2012-02-26 Fracture 588.00 589.00 0
2012-02-26 Fracture 557.00 558.00 0
2012-02-26 Fracture 543.50 544.50 0
2012-02-26 Fracture 512.00 513.00 0
2012-02-26 Fracture 495.00 496.00 0
2012-02-26 Fracture 444.50 445.50 0
2012-02-26 Fracture 419.00 420.00 0
2012-02-22 Perforation 651.50 653.50 13
2012-02-26 Fracture 406.50 407.50 0
2012-02-26 Fracture 362.00 363.00 0
2012-02-26 Fracture 352.00 353.00 0
2012-02-22 Perforation 640.00 641.00 13
2012-02-22 Perforation 597.50 598.50 13
2012-02-22 Perforation 557.00 558.00 7
2012-02-22 Perforation 588.00 589.00 13
2012-02-22 Perforation 543.50 544.50 7
2012-02-22 Perforation 512.00 513.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2352 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8634 0.0 0.0 0.0
2015 8423 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8688 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-22 No Incident Encountered 0.00 0.00
2012-02-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References