X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134042207020

Well Details

Well ID: 0134042207020
Loading map...
Location: 02/07-22-013-04W4/0
Location Alias: 02/07-22-13-04 W4M
Location Alias 2: 02/07-22-013-04 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 04
Section: 22
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 7-22-13-4
Operator Name: Pine Cliff Energy Ltd.
License Number: 0057471
License Date: 1976-03-09
License Status: Issued
Spud Date: 1976-05-14
Final Drill Date: 1976-05-16
Well Total Depth: 496.80 m
Surface Hole Latitude: 50.095370
Surface Hole Longitude: -110.465954

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-03-09 Obtained License
1976-05-16 Finished Drilling
1976-05-16 Production Casing Operation Performed
1976-06-08 Perforation Treatment Performed - Selective Bullet Perforations
1976-07-20 Perforation Treatment Performed - Fractured
1976-09-03 Perforation Treatment Performed - Bullet Perforation
1976-09-03 Perforation Treatment Performed - Selective Bullet Perforations
1976-10-06 Perforation Treatment Performed - Fractured
1976-12-13 Well Mode changed to Drilled and Cased
1977-11-09 Well Began Production
1977-11-09 Well Fluid changed to Gas
1977-11-09 Well Mode changed to Flowing
1984-03-20 Well Fluid changed to Gas
1984-03-20 Well Mode changed to Suspended
1984-09-26 Well Fluid changed to Gas
1984-09-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-08 Selective Bullet Perforations 438.30 439.50 0
1976-06-08 Selective Bullet Perforations 456.00 458.40 0
1976-06-08 Selective Bullet Perforations 462.40 462.40 0
1976-07-20 Fracture 438.30 462.40 0
1976-09-03 Bullet Perforation 414.20 416.70 3
1976-09-03 Selective Bullet Perforations 417.30 417.90 0
1976-09-03 Selective Bullet Perforations 420.60 422.50 0
1976-10-06 Fracture 414.20 422.50 0
1976-06-08 Selective Bullet Perforations 440.70 442.00 0
1976-06-08 Selective Bullet Perforations 443.80 444.40 0
1976-06-08 Selective Bullet Perforations 445.00 445.60 0
1976-06-08 Selective Bullet Perforations 446.20 446.80 0
1976-06-08 Selective Bullet Perforations 447.40 448.10 0
1976-06-08 Selective Bullet Perforations 448.70 449.90 0
1976-06-08 Selective Bullet Perforations 451.10 452.30 0
1976-06-08 Selective Bullet Perforations 453.50 454.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1054 0.0 0.0 0.0
1978 7256 0.0 0.0 0.0
1979 7018 0.0 0.0 0.0
1980 6194 0.0 0.0 0.0
1981 1492 0.0 0.0 0.0
1982 768 0.0 0.0 0.0
1983 288 0.0 0.0 0.0
1984 3855 0.0 0.0 0.0
1985 7056 0.0 0.0 0.0
1986 5630 0.0 0.0 0.0
1987 7290 0.0 0.0 0.0
1988 7999 0.0 0.0 0.0
1989 7993 0.0 0.0 0.0
1990 8725 0.0 0.0 0.0
1991 8452 0.0 0.0 0.0
1992 8769 0.0 0.0 0.0
1993 8715 0.0 0.0 0.0
1994 8751 0.0 0.0 0.0
1995 8730 0.0 0.0 0.0
1996 8748 0.0 0.0 0.0
1997 8692 0.0 0.0 0.0
1998 8742 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8663 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8747 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8747 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References