If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134033114003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.132746,"lon":-110.407281,"icon":""}]} |
Location: 00/14-31-013-03W4/3 | |
Location Alias: 00/14-31-13-03 W4M | |
Location Alias 2: 00/14-31-013-03 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 03 | |
Section: 31 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 14-31-13-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0054015 | |
License Date: 1975-06-24 | |
License Status: Issued | |
Spud Date: 1975-07-26 | |
Final Drill Date: 1975-07-29 | |
Well Total Depth: 573.60 m | |
Surface Hole Latitude: 50.132746 | |
Surface Hole Longitude: -110.407281 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-06-24 | Obtained License |
1975-07-29 | Finished Drilling |
1975-07-29 | Production Casing Operation Performed |
1975-07-29 | Well Mode changed to Drilled and Cased |
1975-10-03 | Perforation Treatment Performed - Selective Bullet Perforations |
1975-10-24 | Perforation Treatment Performed - Fractured |
1976-03-30 | Perforation Treatment Performed - Fractured |
1988-08-18 | Plug Back Performed |
1988-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-09-18 | Perforation Treatment Performed - Jet Perforation |
1988-09-18 | Well Log Performed |
1988-09-19 | Perforation Treatment Performed - Fractured |
1988-10-26 | Well Began Production |
1988-10-26 | Well Fluid changed to Gas |
1988-10-26 | Well Mode changed to Flowing |
2000-02-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-10-03 | Selective Bullet Perforations | 302.70 | 304.20 | 0 |
1975-10-03 | Selective Bullet Perforations | 366.70 | 367.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 373.10 | 374.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 375.20 | 376.10 | 0 |
1975-10-03 | Selective Bullet Perforations | 377.60 | 378.90 | 0 |
1975-10-03 | Selective Bullet Perforations | 380.10 | 386.20 | 0 |
1975-10-03 | Selective Bullet Perforations | 389.50 | 390.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 437.10 | 438.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 438.90 | 439.80 | 0 |
1975-10-03 | Selective Bullet Perforations | 442.60 | 443.80 | 0 |
1975-10-03 | Selective Bullet Perforations | 444.70 | 446.20 | 0 |
1975-10-03 | Selective Bullet Perforations | 306.30 | 310.60 | 0 |
1975-10-03 | Selective Bullet Perforations | 447.10 | 448.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 449.30 | 451.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 452.00 | 453.50 | 0 |
1975-10-03 | Selective Bullet Perforations | 456.00 | 460.20 | 0 |
1975-10-03 | Selective Bullet Perforations | 462.10 | 463.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 464.20 | 465.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 466.60 | 467.90 | 0 |
1975-10-03 | Selective Bullet Perforations | 469.70 | 470.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 471.50 | 473.70 | 0 |
1975-10-03 | Selective Bullet Perforations | 478.80 | 480.10 | 0 |
1975-10-03 | Selective Bullet Perforations | 314.90 | 320.60 | 0 |
1975-10-03 | Selective Bullet Perforations | 481.90 | 496.20 | 0 |
1975-10-03 | Selective Bullet Perforations | 496.80 | 513.60 | 0 |
1975-10-03 | Selective Bullet Perforations | 514.50 | 524.90 | 0 |
1975-10-03 | Selective Bullet Perforations | 525.50 | 530.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 547.70 | 548.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 553.50 | 553.80 | 0 |
1975-10-03 | Selective Bullet Perforations | 560.20 | 562.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 565.70 | 565.70 | 0 |
1975-10-24 | Fracture | 302.70 | 565.70 | 0 |
1976-03-30 | Fracture | 437.10 | 565.70 | 0 |
1975-10-03 | Selective Bullet Perforations | 322.50 | 324.30 | 0 |
1988-09-18 | Packing Device Capped w/Cement | 433.80 | 435.80 | 0 |
1988-09-18 | Perforation | 421.00 | 430.50 | 13 |
1988-09-19 | Fracture | 421.00 | 430.50 | 0 |
1975-10-03 | Selective Bullet Perforations | 328.60 | 329.50 | 0 |
1975-10-03 | Selective Bullet Perforations | 331.90 | 332.50 | 0 |
1975-10-03 | Selective Bullet Perforations | 337.40 | 338.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 342.00 | 342.60 | 0 |
1975-10-03 | Selective Bullet Perforations | 359.40 | 361.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 1602 | 0.0 | 0.0 | 0.0 |
1989 | 4817 | 0.0 | 0.0 | 0.0 |
1990 | 5656 | 0.0 | 0.0 | 0.0 |
1991 | 7823 | 0.0 | 0.0 | 0.0 |
1992 | 5781 | 0.0 | 0.0 | 0.0 |
1993 | 7914 | 0.0 | 0.0 | 0.0 |
1994 | 8156 | 0.0 | 0.0 | 0.0 |
1995 | 8548 | 0.0 | 0.0 | 0.0 |
1996 | 2874 | 0.0 | 0.0 | 0.0 |
1997 | 2698 | 0.0 | 0.0 | 0.0 |
1998 | 726 | 0.0 | 0.0 | 0.0 |
1999 | 2175 | 0.0 | 0.0 | 0.0 |
For data sources see[5]