If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134033108002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.124463,"lon":-110.39236,"icon":""}]} |
Location: 00/08-31-013-03W4/2 | |
Location Alias: 00/08-31-13-03 W4M | |
Location Alias 2: 00/08-31-013-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 03 | |
Section: 31 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 8-31-13-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0054042 | |
License Date: 1975-06-25 | |
License Status: Abandoned | |
Spud Date: 1975-07-30 | |
Final Drill Date: 1975-08-02 | |
Well Total Depth: 571.50 m | |
Surface Hole Latitude: 50.124463 | |
Surface Hole Longitude: -110.392360 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-06-25 | Obtained License |
1975-08-02 | Finished Drilling |
1975-08-02 | Production Casing Operation Performed |
1975-08-02 | Well Mode changed to Drilled and Cased |
1975-09-29 | Perforation Treatment Performed - Selective Bullet Perforations |
1975-10-24 | Perforation Treatment Performed - Fractured |
1975-12-01 | Well Began Production |
1975-12-01 | Well Fluid changed to Gas |
1975-12-01 | Well Mode changed to Flowing |
1982-02-15 | Perforation Treatment Performed - Jet Perforation |
1982-02-24 | Perforation Treatment Performed - Fractured |
1982-02-25 | Perforation Treatment Performed - Jet Perforation |
1982-03-02 | Perforation Treatment Performed - Fractured |
2006-10-31 | Well Fluid changed to Gas |
2006-10-31 | Well Mode changed to Suspended |
2011-01-26 | Perforation Treatment Performed - Cement Plug |
2011-01-26 | Plug Back Performed |
2011-01-26 | Well Fluid changed to Gas |
2011-01-26 | Well Mode changed to Abandoned Zone |
2011-02-02 | Well Abandoned |
2011-02-02 | Well Fluid changed to Gas |
2011-02-02 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-09-29 | Selective Bullet Perforations | 318.80 | 328.30 | 0 |
1975-09-29 | Selective Bullet Perforations | 355.70 | 371.60 | 0 |
1975-09-29 | Selective Bullet Perforations | 372.80 | 373.70 | 0 |
1975-09-29 | Selective Bullet Perforations | 375.50 | 379.20 | 0 |
1975-09-29 | Selective Bullet Perforations | 380.70 | 381.90 | 0 |
1975-09-29 | Selective Bullet Perforations | 382.80 | 385.00 | 0 |
1975-09-29 | Selective Bullet Perforations | 386.20 | 388.00 | 0 |
1975-09-29 | Selective Bullet Perforations | 388.90 | 390.10 | 0 |
1975-09-29 | Selective Bullet Perforations | 391.40 | 395.00 | 0 |
1975-09-29 | Selective Bullet Perforations | 396.50 | 447.10 | 0 |
1975-09-29 | Selective Bullet Perforations | 448.10 | 449.00 | 0 |
1975-09-29 | Selective Bullet Perforations | 331.90 | 332.50 | 0 |
1975-09-29 | Selective Bullet Perforations | 451.40 | 452.30 | 0 |
1975-09-29 | Selective Bullet Perforations | 453.20 | 455.70 | 0 |
1975-09-29 | Selective Bullet Perforations | 457.50 | 459.00 | 0 |
1975-09-29 | Selective Bullet Perforations | 461.80 | 465.10 | 0 |
1975-09-29 | Selective Bullet Perforations | 470.30 | 471.50 | 0 |
1975-09-29 | Selective Bullet Perforations | 475.50 | 476.10 | 0 |
1975-09-29 | Selective Bullet Perforations | 477.00 | 480.40 | 0 |
1975-09-29 | Selective Bullet Perforations | 496.20 | 497.40 | 0 |
1975-09-29 | Selective Bullet Perforations | 498.30 | 503.20 | 0 |
1975-09-29 | Selective Bullet Perforations | 505.10 | 521.20 | 0 |
1975-09-29 | Selective Bullet Perforations | 336.50 | 337.10 | 0 |
1975-09-29 | Selective Bullet Perforations | 521.80 | 525.50 | 0 |
1975-09-29 | Selective Bullet Perforations | 526.70 | 534.60 | 0 |
1975-09-29 | Selective Bullet Perforations | 539.50 | 556.60 | 0 |
1975-09-29 | Selective Bullet Perforations | 560.20 | 564.20 | 0 |
1975-10-24 | Fracture | 318.80 | 564.20 | 0 |
1982-02-15 | Perforation | 446.20 | 448.70 | 10 |
1982-02-24 | Fracture | 446.20 | 449.00 | 0 |
1982-02-25 | Perforation | 381.60 | 384.70 | 7 |
1982-03-02 | Fracture | 379.20 | 396.50 | 0 |
2011-01-26 | Cement Plug | 67.00 | 568.00 | 0 |
1975-09-29 | Selective Bullet Perforations | 338.30 | 341.40 | 0 |
1975-09-29 | Selective Bullet Perforations | 342.30 | 343.20 | 0 |
1975-09-29 | Selective Bullet Perforations | 345.00 | 346.60 | 0 |
1975-09-29 | Selective Bullet Perforations | 348.10 | 349.00 | 0 |
1975-09-29 | Selective Bullet Perforations | 350.50 | 351.10 | 0 |
1975-09-29 | Selective Bullet Perforations | 352.70 | 354.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 8534 | 0.0 | 0.0 | 0.0 |
1977 | 8747 | 0.0 | 0.0 | 0.0 |
1978 | 8559 | 0.0 | 0.0 | 0.0 |
1979 | 7087 | 0.0 | 0.0 | 0.0 |
1980 | 8716 | 0.0 | 0.0 | 0.0 |
1981 | 8695 | 0.0 | 0.0 | 0.0 |
1982 | 8393 | 0.0 | 0.0 | 0.0 |
1983 | 7992 | 0.0 | 0.0 | 0.0 |
1984 | 3996 | 0.0 | 0.0 | 0.0 |
1985 | 4032 | 0.0 | 0.0 | 0.0 |
1986 | 4390 | 0.0 | 0.0 | 0.0 |
1987 | 4408 | 0.0 | 0.0 | 0.0 |
1988 | 1372 | 0.0 | 0.0 | 0.0 |
1990 | 576 | 0.0 | 0.0 | 0.0 |
For data sources see[5]