If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134033008003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.110846,"lon":-110.392302,"icon":""}]} |
Location: 00/08-30-013-03W4/3 | |
Location Alias: 00/08-30-13-03 W4M | |
Location Alias 2: 00/08-30-013-03 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 03 | |
Section: 30 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 8-30-13-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0054046 | |
License Date: 1975-06-26 | |
License Status: Suspension | |
Spud Date: 1975-08-06 | |
Final Drill Date: 1975-08-07 | |
Well Total Depth: 587.00 m | |
Surface Hole Latitude: 50.110846 | |
Surface Hole Longitude: -110.392302 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-06-26 | Obtained License |
1975-08-07 | Finished Drilling |
1975-08-07 | Well Mode changed to Drilled and Cased |
1975-08-08 | Production Casing Operation Performed |
1975-09-26 | Perforation Treatment Performed - Selective Bullet Perforations |
1975-10-23 | Perforation Treatment Performed - Fractured |
1977-02-03 | Perforation Treatment Performed - Fractured |
1988-09-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-09-20 | Perforation Treatment Performed - Jet Perforation |
1988-09-20 | Plug Back Performed |
1988-09-20 | Well Log Performed |
1988-09-22 | Perforation Treatment Performed - Fractured |
1988-10-26 | Well Began Production |
1988-10-26 | Well Fluid changed to Gas |
1988-10-26 | Well Mode changed to Flowing |
1988-10-27 | Well Fluid changed to Gas |
1988-10-27 | Well Mode changed to Flowing |
2011-09-01 | Well Fluid changed to Gas |
2011-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-09-26 | Selective Bullet Perforations | 324.90 | 326.40 | 0 |
1975-09-26 | Selective Bullet Perforations | 386.20 | 387.10 | 0 |
1975-09-26 | Selective Bullet Perforations | 388.30 | 389.20 | 0 |
1975-09-26 | Selective Bullet Perforations | 390.10 | 392.90 | 0 |
1975-09-26 | Selective Bullet Perforations | 393.80 | 396.20 | 0 |
1975-09-26 | Selective Bullet Perforations | 397.50 | 398.70 | 0 |
1975-09-26 | Selective Bullet Perforations | 400.50 | 401.40 | 0 |
1975-09-26 | Selective Bullet Perforations | 402.30 | 403.30 | 0 |
1975-09-26 | Selective Bullet Perforations | 407.80 | 408.70 | 0 |
1975-09-26 | Selective Bullet Perforations | 410.30 | 412.10 | 0 |
1975-09-26 | Selective Bullet Perforations | 459.90 | 461.20 | 0 |
1975-09-26 | Selective Bullet Perforations | 328.60 | 330.40 | 0 |
1975-09-26 | Selective Bullet Perforations | 462.10 | 466.00 | 0 |
1975-09-26 | Selective Bullet Perforations | 466.60 | 469.70 | 0 |
1975-09-26 | Selective Bullet Perforations | 474.30 | 475.50 | 0 |
1975-09-26 | Selective Bullet Perforations | 479.80 | 484.30 | 0 |
1975-09-26 | Selective Bullet Perforations | 485.20 | 486.20 | 0 |
1975-09-26 | Selective Bullet Perforations | 486.80 | 488.90 | 0 |
1975-09-26 | Selective Bullet Perforations | 490.70 | 492.60 | 0 |
1975-09-26 | Selective Bullet Perforations | 493.80 | 497.70 | 0 |
1975-09-26 | Selective Bullet Perforations | 498.30 | 519.10 | 0 |
1975-09-26 | Selective Bullet Perforations | 520.60 | 521.50 | 0 |
1975-09-26 | Selective Bullet Perforations | 334.70 | 335.90 | 0 |
1975-09-26 | Selective Bullet Perforations | 534.60 | 535.20 | 0 |
1975-09-26 | Selective Bullet Perforations | 542.20 | 549.20 | 0 |
1975-09-26 | Selective Bullet Perforations | 551.70 | 570.90 | 0 |
1975-09-26 | Selective Bullet Perforations | 571.50 | 574.90 | 0 |
1975-09-26 | Selective Bullet Perforations | 575.50 | 575.50 | 0 |
1975-10-23 | Fracture | 324.90 | 575.50 | 0 |
1977-02-03 | Fracture | 461.20 | 490.70 | 0 |
1988-09-20 | Packing Device Capped w/Cement | 454.00 | 456.00 | 0 |
1988-09-20 | Perforation | 443.00 | 449.00 | 13 |
1988-09-22 | Fracture | 443.00 | 449.00 | 0 |
1975-09-26 | Selective Bullet Perforations | 338.00 | 347.50 | 0 |
1975-09-26 | Selective Bullet Perforations | 351.10 | 352.00 | 0 |
1975-09-26 | Selective Bullet Perforations | 353.30 | 354.80 | 0 |
1975-09-26 | Selective Bullet Perforations | 356.00 | 357.80 | 0 |
1975-09-26 | Selective Bullet Perforations | 359.40 | 361.50 | 0 |
1975-09-26 | Selective Bullet Perforations | 363.60 | 383.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 1608 | 0.0 | 0.0 | 0.0 |
1989 | 2476 | 0.0 | 0.0 | 0.0 |
2002 | 719 | 0.0 | 0.0 | 0.0 |
For data sources see[5]