X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134032806023

Well Details

Well ID: 0134032806023
Loading map...
Location: 02/06-28-013-03W4/3
Location Alias: 02/06-28-13-03 W4M
Location Alias 2: 02/06-28-013-03 W4/03
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 03
Section: 28
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-28-13-3
Operator Name: Canlin Energy Corporation
License Number: 0054134
License Date: 1975-07-04
License Status: Abandoned
Spud Date: 1975-08-02
Final Drill Date: 1975-08-08
Well Total Depth: 647.70 m
Surface Hole Latitude: 50.109947
Surface Hole Longitude: -110.358260

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-07-04 Obtained License
1975-08-08 Finished Drilling
1975-08-08 Well Mode changed to Drilled and Cased
1975-08-11 Production Casing Operation Performed
1975-09-19 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-21 Perforation Treatment Performed - Selective Bullet Perforations
1976-04-14 Perforation Treatment Performed - Fractured
1976-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-09-22 Perforation Treatment Performed - Jet Perforation
1976-09-27 Perforation Treatment Performed - Fractured
1976-10-16 Well Began Production
1976-10-16 Well Fluid changed to Gas
1976-10-16 Well Mode changed to Flowing
1998-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-04-21 Plug Back Performed
1998-06-16 Well Abandoned
1998-06-16 Well Fluid changed to Gas
1998-06-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-19 Selective Bullet Perforations 447.80 448.70 0
1975-10-21 Selective Bullet Perforations 546.50 548.00 0
1975-10-21 Selective Bullet Perforations 550.80 558.40 0
1975-10-21 Selective Bullet Perforations 559.00 562.40 0
1975-10-21 Selective Bullet Perforations 563.00 605.30 0
1975-10-21 Selective Bullet Perforations 606.20 607.20 0
1975-10-21 Selective Bullet Perforations 610.20 611.10 0
1975-10-21 Selective Bullet Perforations 612.00 613.00 0
1975-10-21 Selective Bullet Perforations 616.60 617.20 0
1975-10-21 Selective Bullet Perforations 619.40 620.00 0
1976-04-14 Fracture 447.80 563.00 0
1975-09-19 Selective Bullet Perforations 449.60 450.50 0
1976-05-05 Packing Device Capped w/Cement 592.80 600.50 0
1976-09-22 Perforation 337.10 337.70 3
1976-09-22 Perforation 348.70 349.30 3
1976-09-22 Perforation 382.20 383.10 3
1976-09-22 Perforation 384.00 384.70 3
1976-09-27 Fracture 337.10 384.70 0
1998-04-21 Packing Device Capped w/Cement 319.00 327.00 0
1975-09-19 Selective Bullet Perforations 451.40 451.40 0
1975-10-21 Selective Bullet Perforations 453.80 454.80 0
1975-10-21 Selective Bullet Perforations 459.90 460.90 0
1975-10-21 Selective Bullet Perforations 473.00 474.00 0
1975-10-21 Selective Bullet Perforations 475.20 509.60 0
1975-10-21 Selective Bullet Perforations 527.90 528.50 0
1975-10-21 Selective Bullet Perforations 539.20 539.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1464 0.0 0.0 0.0
1977 8651 0.0 0.0 0.0
1978 8685 0.0 0.0 0.0
1979 7222 0.0 0.0 0.0
1980 8674 0.0 0.0 0.0
1981 8709 0.0 0.0 0.0
1982 8693 0.0 0.0 0.0
1983 8736 0.0 0.0 0.0
1984 4707 0.0 0.0 0.0
1985 4040 0.0 0.0 0.0
1986 5852 0.0 0.0 0.0
1987 6633 0.0 0.0 0.0
1988 8246 0.0 0.0 0.0
1989 8372 0.0 0.0 0.0
1990 8341 0.0 0.0 0.0
1991 8335 0.0 0.0 0.0
1992 8409 0.0 0.0 0.0
1993 8516 0.0 0.0 0.0
1994 8615 0.0 0.0 0.0
1995 8749 0.0 0.0 0.0
1996 2903 0.0 0.0 0.0
1997 5804 0.0 0.0 0.0
1998 1416 0.0 0.0 0.0

For data sources see[5]

References