If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134032714000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.120018,"lon":-110.34022,"icon":""}]} |
Location: 00/14-27-013-03W4/0 | |
Location Alias: 00/14-27-13-03 W4M | |
Location Alias 2: 00/14-27-013-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 03 | |
Section: 27 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 14-27-13-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0054054 | |
License Date: 1975-06-26 | |
License Status: Issued | |
Spud Date: 1975-08-18 | |
Final Drill Date: 1975-08-20 | |
Well Total Depth: 590.70 m | |
Surface Hole Latitude: 50.120018 | |
Surface Hole Longitude: -110.340220 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-06-26 | Obtained License |
1975-08-20 | Finished Drilling |
1975-08-20 | Well Mode changed to Drilled and Cased |
1975-08-21 | Production Casing Operation Performed |
1975-10-03 | Perforation Treatment Performed - Selective Bullet Perforations |
1975-10-31 | Perforation Treatment Performed - Fractured |
1975-12-01 | Well Began Production |
1975-12-01 | Well Fluid changed to Gas |
1975-12-01 | Well Mode changed to Flowing |
1976-12-20 | Perforation Treatment Performed - Fractured |
1979-10-11 | Perforation Treatment Performed - Jet Perforation |
1979-10-13 | Perforation Treatment Performed - Fractured |
1994-02-01 | Well Fluid changed to Gas |
1994-02-01 | Well Mode changed to Suspended |
2010-10-12 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-10-03 | Selective Bullet Perforations | 328.00 | 331.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 367.60 | 368.50 | 0 |
1975-10-03 | Selective Bullet Perforations | 370.90 | 388.60 | 0 |
1975-10-03 | Selective Bullet Perforations | 389.50 | 390.80 | 0 |
1975-10-03 | Selective Bullet Perforations | 391.70 | 392.60 | 0 |
1975-10-03 | Selective Bullet Perforations | 393.80 | 394.70 | 0 |
1975-10-03 | Selective Bullet Perforations | 395.30 | 399.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 400.50 | 401.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 402.30 | 403.60 | 0 |
1975-10-03 | Selective Bullet Perforations | 405.40 | 406.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 407.20 | 408.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 334.10 | 335.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 410.30 | 415.10 | 0 |
1975-10-03 | Selective Bullet Perforations | 416.10 | 417.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 467.60 | 468.50 | 0 |
1975-10-03 | Selective Bullet Perforations | 469.40 | 470.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 472.70 | 473.70 | 0 |
1975-10-03 | Selective Bullet Perforations | 474.90 | 477.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 489.80 | 490.70 | 0 |
1975-10-03 | Selective Bullet Perforations | 491.90 | 492.90 | 0 |
1975-10-03 | Selective Bullet Perforations | 496.80 | 498.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 500.20 | 503.20 | 0 |
1975-10-03 | Selective Bullet Perforations | 341.40 | 345.90 | 0 |
1975-10-03 | Selective Bullet Perforations | 505.40 | 525.20 | 0 |
1975-10-03 | Selective Bullet Perforations | 527.60 | 543.80 | 0 |
1975-10-03 | Selective Bullet Perforations | 545.00 | 546.80 | 0 |
1975-10-03 | Selective Bullet Perforations | 547.70 | 553.80 | 0 |
1975-10-03 | Selective Bullet Perforations | 554.70 | 574.90 | 0 |
1975-10-03 | Selective Bullet Perforations | 576.40 | 576.40 | 0 |
1975-10-31 | Fracture | 328.00 | 576.40 | 0 |
1976-12-20 | Fracture | 467.60 | 492.90 | 0 |
1979-10-11 | Perforation | 402.30 | 403.30 | 6 |
1979-10-13 | Fracture | 399.00 | 417.00 | 0 |
1975-10-03 | Selective Bullet Perforations | 348.10 | 349.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 351.70 | 356.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 357.20 | 358.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 359.40 | 360.30 | 0 |
1975-10-03 | Selective Bullet Perforations | 361.50 | 362.40 | 0 |
1975-10-03 | Selective Bullet Perforations | 363.60 | 366.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 744 | 0.0 | 0.0 | 0.0 |
1976 | 8247 | 0.0 | 0.0 | 0.0 |
1977 | 8746 | 0.0 | 0.0 | 0.0 |
1978 | 6668 | 0.0 | 0.0 | 0.0 |
1979 | 6485 | 0.0 | 0.0 | 0.0 |
1980 | 6080 | 0.0 | 0.0 | 0.0 |
1981 | 6494 | 0.0 | 0.0 | 0.0 |
1982 | 8731 | 0.0 | 0.0 | 0.0 |
1983 | 6045 | 0.0 | 0.0 | 0.0 |
1984 | 6904 | 0.0 | 0.0 | 0.0 |
1985 | 8002 | 0.0 | 0.0 | 0.0 |
1986 | 6384 | 0.0 | 0.0 | 0.0 |
1987 | 5940 | 0.0 | 0.0 | 0.0 |
1988 | 1477 | 0.0 | 0.0 | 0.0 |
For data sources see[5]