If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134032706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.112956,"lon":-110.335084,"icon":""}]} |
Location: 00/06-27-013-03W4/0 | |
Location Alias: 00/06-27-13-03 W4M | |
Location Alias 2: 00/06-27-013-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 03 | |
Section: 27 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 6-27-13-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0069914 | |
License Date: 1978-06-02 | |
License Status: Suspension | |
Spud Date: 1978-06-04 | |
Final Drill Date: 1978-06-05 | |
Well Total Depth: 544.70 m | |
Surface Hole Latitude: 50.112956 | |
Surface Hole Longitude: -110.335084 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-06-02 | Obtained License |
1978-06-05 | Finished Drilling |
1978-06-05 | Production Casing Operation Performed |
1978-06-05 | Well Mode changed to Drilled and Cased |
1978-07-07 | Perforation Treatment Performed - Jet Perforation |
1978-07-07 | Perforation Treatment Performed - Selective Jet Perforations |
1978-07-11 | Perforation Treatment Performed - Fractured |
1978-07-16 | Perforation Treatment Performed - Jet Perforation |
1978-07-19 | Perforation Treatment Performed - Fractured |
1978-08-08 | Well Began Production |
1978-08-08 | Well Fluid changed to Gas |
1978-08-08 | Well Mode changed to Flowing |
1986-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-08-21 | Perforation Treatment Performed - Jet Perforation |
1986-08-21 | Plug Back Performed |
1986-08-21 | Well Fluid changed to Gas |
1986-08-21 | Well Mode changed to Abandoned Zone |
1986-08-22 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-07-07 | Perforation | 470.60 | 471.80 | 3 |
1986-08-21 | Perforation | 428.50 | 433.50 | 5 |
1986-08-22 | Fracture | 428.50 | 433.50 | 0 |
1978-07-07 | Selective Jet Perforations | 472.40 | 473.00 | 0 |
1978-07-07 | Selective Jet Perforations | 448.70 | 449.30 | 0 |
1978-07-07 | Perforation | 445.00 | 448.10 | 2 |
1978-07-11 | Fracture | 445.00 | 473.00 | 0 |
1978-07-16 | Perforation | 380.70 | 384.00 | 3 |
1978-07-16 | Perforation | 384.70 | 386.50 | 2 |
1978-07-19 | Fracture | 380.70 | 386.50 | 0 |
1986-08-21 | Packing Device Capped w/Cement | 438.00 | 440.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 1938 | 0.0 | 0.0 | 0.0 |
1979 | 6465 | 0.0 | 0.0 | 0.0 |
1980 | 6089 | 0.0 | 0.0 | 0.0 |
1981 | 8703 | 0.0 | 0.0 | 0.0 |
1982 | 8736 | 0.0 | 0.0 | 0.0 |
1983 | 5327 | 0.0 | 0.0 | 0.0 |
1984 | 5445 | 0.0 | 0.0 | 0.0 |
1985 | 5820 | 0.0 | 0.0 | 0.0 |
1986 | 2875 | 0.0 | 0.0 | 0.0 |
For data sources see[5]