If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134032606030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.112297,"lon":-110.313481,"icon":""}]} |
Location: 03/06-26-013-03W4/0 | |
Location Alias: 03/06-26-13-03 W4M | |
Location Alias 2: 03/06-26-013-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 03 | |
Section: 26 | |
County/Municipality: Cypress County | |
Well Name: PINE CLIFF MEDHAT 6-26-13-3 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0096578 | |
License Date: 1982-07-06 | |
License Status: Issued | |
Spud Date: 1982-09-17 | |
Final Drill Date: 1982-09-19 | |
Well Total Depth: 505.00 m | |
Surface Hole Latitude: 50.112297 | |
Surface Hole Longitude: -110.313481 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-07-06 | Obtained License |
1982-09-17 | Lost Circulation Occurred |
1982-09-19 | Finished Drilling |
1982-09-19 | Well Mode changed to Drilled and Cased |
1982-09-20 | Drill Stem Test Performed |
1982-09-21 | Production Casing Operation Performed |
1982-11-02 | Perforation Treatment Performed - Jet Perforation |
1982-11-05 | Perforation Treatment Performed - Fractured |
1982-12-06 | Perforation Treatment Performed - Fractured |
1982-12-06 | Perforation Treatment Performed - Jet Perforation |
1982-12-06 | Well Began Production |
1982-12-06 | Well Fluid changed to Gas |
1982-12-06 | Well Mode changed to Flowing |
1985-11-15 | Well Fluid changed to Gas |
1985-11-15 | Well Mode changed to Suspended |
1987-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-08-26 | Plug Back Performed |
1987-08-26 | Well Fluid changed to Gas |
1987-08-26 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-11-02 | Perforation | 468.00 | 472.50 | 6 |
1982-11-05 | Fracture | 468.00 | 472.50 | 0 |
1982-12-06 | Perforation | 452.00 | 459.00 | 6 |
1982-12-06 | Fracture | 452.00 | 459.00 | 0 |
1987-08-26 | Packing Device Capped w/Cement | 464.00 | 465.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 46 | 0.0 | 0.0 | 0.0 |
1983 | 2167 | 0.0 | 0.0 | 0.0 |
1985 | 1269 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1982-09-17 | Lost Circulation | 18.00 | 45.00 |
For data sources see[6]