X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134023014002

Well Details

Well ID: 0134023014002
Loading map...
Location: 00/14-30-013-02W4/2
Location Alias: 00/14-30-13-02 W4M
Location Alias 2: 00/14-30-013-02 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 02
Section: 30
County/Municipality: Cypress County
Well Name: DEML MEDHAT 14-30-13-2
Operator Name: Direct Energy Marketing Limited
License Number: 0070706
License Date: 1978-07-13
License Status: RecCertified
Spud Date: 1978-07-13
Final Drill Date: 1978-07-14
Well Total Depth: 501.40 m
Surface Hole Latitude: 50.117403
Surface Hole Longitude: -110.268612

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-13 Obtained License
1978-07-14 Finished Drilling
1978-07-14 Well Mode changed to Drilled and Cased
1978-07-15 Production Casing Operation Performed
1978-07-19 Perforation Treatment Performed - Jet Perforation
1978-07-20 Perforation Treatment Performed - Fractured
1978-07-27 Perforation Treatment Performed - Jet Perforation
1978-07-28 Perforation Treatment Performed - Fractured
1978-09-28 Well Began Production
1978-09-28 Well Fluid changed to Gas
1978-09-28 Well Mode changed to Flowing
1980-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-06-02 Perforation Treatment Performed - Jet Perforation
1980-06-09 Perforation Treatment Performed - Fractured
1986-05-06 Well Fluid changed to Gas
1986-05-06 Well Mode changed to Suspended
1986-07-01 Well Fluid changed to Gas
1986-07-01 Well Mode changed to Flowing
1988-05-31 Well Fluid changed to Gas
1988-05-31 Well Mode changed to Suspended
1998-04-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-04-19 Plug Back Performed
1998-10-27 Well Fluid changed to Gas
1998-10-27 Well Mode changed to Abandoned
1998-10-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-19 Perforation 433.00 436.00 2
1978-07-19 Perforation 457.00 463.00 2
1978-07-20 Fracture 433.00 463.00 0
1978-07-27 Perforation 366.00 370.80 3
1978-07-28 Fracture 366.00 370.80 0
1980-06-02 Packing Device Capped w/Cement 442.50 450.00 0
1980-06-02 Perforation 433.00 436.00 3
1980-06-09 Fracture 433.00 436.00 0
1998-04-19 Packing Device Capped w/Cement 346.00 354.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1712 0.0 0.0 0.0
1979 6959 0.0 0.0 0.0
1980 7540 0.0 0.0 0.0
1981 8325 0.0 0.0 0.0
1982 7464 0.0 0.0 0.0
1983 4882 0.0 0.0 0.0
1986 4410 0.0 0.0 0.0

For data sources see[5]

References