X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134022908002

Well Details

Well ID: 0134022908002
Loading map...
Location: 00/08-29-013-02W4/2
Location Alias: 00/08-29-13-02 W4M
Location Alias 2: 00/08-29-013-02 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 02
Section: 29
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-29-13-2
Operator Name: Canlin Energy Corporation
License Number: 0089796
License Date: 1981-04-16
License Status: Abandoned
Spud Date: 1981-04-30
Final Drill Date: 1981-05-01
Well Total Depth: 511.00 m
Surface Hole Latitude: 50.110235
Surface Hole Longitude: -110.235947

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-04-16 Obtained License
1981-05-01 Finished Drilling
1981-05-01 Production Casing Operation Performed
1981-05-01 Well Mode changed to Drilled and Cased
1981-05-20 Perforation Treatment Performed - Jet Perforation
1981-05-21 Perforation Treatment Performed - Fractured
1981-05-27 Perforation Treatment Performed - Fractured
1981-06-02 Perforation Treatment Performed - Fractured
1981-06-02 Perforation Treatment Performed - Jet Perforation
1981-07-22 Well Began Production
1981-07-22 Well Fluid changed to Gas
1981-07-22 Well Mode changed to Flowing
1984-05-30 Well Fluid changed to Gas
1984-05-30 Well Mode changed to Suspended
1988-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-23 Perforation Treatment Performed - Jet Perforation
1988-01-23 Plug Back Performed
1988-01-23 Well Fluid changed to Gas
1988-01-23 Well Mode changed to Suspended
1988-01-27 Perforation Treatment Performed - Fractured
1988-02-02 Perforation Treatment Performed - Jet Perforation
1988-02-03 Perforation Treatment Performed - Fractured
1988-02-07 Well Fluid changed to Gas
1988-02-07 Well Mode changed to Flowing
1991-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-09 Plug Back Performed
1991-08-09 Well Abandoned
1991-08-09 Well Fluid changed to Gas
1991-08-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-05-20 Perforation 442.00 443.50 10
1988-02-02 Perforation 330.00 335.00 7
1988-02-03 Fracture 330.00 335.00 0
1991-08-09 Packing Device Capped w/Cement 317.00 325.00 0
1981-05-21 Fracture 442.00 443.50 0
1981-05-27 Fracture 442.00 443.50 0
1981-06-02 Perforation 374.00 377.00 10
1981-06-02 Fracture 374.00 377.00 0
1988-01-23 Packing Device Capped w/Cement 436.00 438.00 0
1988-01-23 Perforation 346.00 349.00 7
1988-01-23 Perforation 364.00 366.00 7
1988-01-27 Fracture 346.00 366.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3980 0.0 0.0 0.0
1982 2855 0.0 0.0 0.0
1983 1903 0.0 0.0 0.0
1988 526 0.0 0.0 0.0

For data sources see[5]

References