X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0125021215002

Well Details

Well ID: 0125021215002
Loading map...
Location: 00/15-12-012-02W5/2
Location Alias: 00/15-12-12-02 W5M
Location Alias 2: 00/15-12-012-02 W5/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 5
Range: 02
Section: 12
County/Municipality: Municipal District of Ranchland No. 66
Well Name: BP MARATHON CALLUM 15-12-12-2
Operator Name: Lexin Resources Ltd.
License Number: 0254148
License Date: 2001-04-17
License Status: RecExempt
Spud Date: 2001-07-29
Final Drill Date: 2001-09-10
Well Total Depth: 3130.00 m
Surface Hole Latitude: 49.985813
Surface Hole Longitude: -114.129269

For data sources see[1][2]

Well History

Date Event
2001-04-17 Obtained License
2001-07-30 Direction Drilling Operation Performed - Deviate
2001-08-04 Surface Casing Operation Performed
2001-08-23 Direction Drilling Operation Performed - Deviate
2001-09-10 Finished Drilling
2001-09-10 Well Log Performed
2001-09-11 Well Log Performed
2001-09-14 Well Log Performed
2001-09-15 Well Log Performed
2001-09-20 Production Casing Operation Performed
2001-09-22 Rig Released
2001-09-22 Well Mode changed to Drilled and Cased
2001-09-28 Perforation Treatment Performed - Jet Perforation
2001-09-30 Perforation Treatment Performed - Fractured
2001-09-30 Perforation Treatment Performed - Jet Perforation
2001-10-04 Perforation Treatment Performed - Jet Perforation
2001-10-05 Perforation Treatment Performed - Fractured
2001-10-05 Perforation Treatment Performed - Jet Perforation
2001-10-06 Perforation Treatment Performed - Fractured
2001-10-06 Perforation Treatment Performed - Jet Perforation
2001-10-15 Well Began Production
2001-10-15 Well Fluid changed to Gas
2001-10-15 Well Mode changed to Flowing
2004-10-01 Perforation Treatment Performed - Jet Perforation
2004-10-01 Well Log Performed
2004-10-04 Perforation Treatment Performed - Fractured
2010-01-11 Perforation Treatment Performed - Cement Plug
2010-01-11 Plug Back Performed
2010-01-11 Well Fluid changed to Gas
2010-01-11 Well Mode changed to Abandoned Zone
2010-01-14 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-07-30 100.00 Deviate (5 - 79 degrees)
2001-08-23 1385.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-09-28 Perforation 3061.00 3064.00 20
2001-10-06 Perforation 2343.00 2346.00 20
2001-10-06 Fracture 2343.00 2346.00 0
2001-10-06 Perforation 2303.00 2306.00 20
2001-10-06 Perforation 2030.00 2033.00 20
2001-10-06 Fracture 2030.00 2033.00 0
2004-10-01 Perforation 1808.00 1812.00 20
2004-10-04 Fracture 1808.00 1812.00 0
2010-01-11 Cement Plug 1425.00 3083.00 0
2001-09-30 Fracture 3061.00 3064.00 0
2001-09-30 Perforation 2938.00 2941.00 20
2001-09-30 Fracture 2938.00 2941.00 0
2001-09-30 Perforation 2885.00 2888.00 20
2001-10-04 Perforation 2628.00 2631.00 20
2001-10-05 Fracture 2628.00 2631.00 0
2001-10-05 Perforation 2498.00 2501.00 20
2001-10-05 Fracture 2498.00 2501.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 755 0.0 0.0 0.0
2002 713 0.0 0.0 0.0
2003 518 0.0 0.0 0.0
2004 404 0.0 0.0 0.0

For data sources see[6]

References