X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124201210000

Well Details

Well ID: 0124201210000
Loading map...
Location: 00/10-12-012-20W4/0
Location Alias: 00/10-12-12-20 W4M
Location Alias 2: 00/10-12-012-20 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 20
Section: 12
County/Municipality: Lethbridge County
Well Name: DARIAN RETLAW 10-12-12-20
Operator Name: Crescent Point Energy Corp.
License Number: 0272410
License Date: 2002-08-06
License Status: Suspension
Spud Date: 2002-12-12
Final Drill Date: 2002-12-17
Well Total Depth: 1289.00 m
Surface Hole Latitude: 49.978913
Surface Hole Longitude: -112.603390

For data sources see[1][2]

Well History

Date Event
2002-08-06 Obtained License
2002-12-13 Surface Casing Operation Performed
2002-12-14 Direction Drilling Operation Performed - Deviate
2002-12-17 Finished Drilling
2002-12-17 Well Log Performed
2002-12-17 Well Mode changed to Drilled and Cased
2002-12-18 Production Casing Operation Performed
2002-12-18 Rig Released
2002-12-21 Perforation Treatment Performed - Jet Perforation
2002-12-21 Well Log Performed
2003-01-06 Well Fluid changed to Gas
2003-01-06 Well Mode changed to Testing
2003-05-18 Well Began Production
2003-05-18 Well Fluid changed to Gas
2003-05-18 Well Mode changed to Flowing
2011-10-01 Well Fluid changed to Gas
2011-10-01 Well Mode changed to Suspended
2019-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-09 Plug Back Performed
2019-12-09 Well Fluid changed to Gas
2019-12-09 Well Log Performed
2019-12-09 Well Mode changed to Abandoned Zone
2020-02-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2020-02-19 Perforation Treatment Performed - Remedial Casing
2020-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-20 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-12-14 297.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-12-21 Perforation 1221.00 1223.00 17
2019-12-09 Packing Device Capped w/Cement 1209.00 1217.00 0
2020-02-17 Hydra Jet Perforation 875.00 880.00 0
2020-02-19 Remedial Casing Cementing 875.00 880.00 0
2020-02-20 Packing Device Capped w/Cement 764.60 895.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4234 0.0 0.0 0.0
2004 8535 0.0 0.0 0.0
2005 8550 0.0 0.0 0.0
2006 8586 0.0 0.0 0.0
2007 7327 0.0 0.0 0.0
2008 6531 0.0 0.0 0.0
2009 8309 0.0 0.0 0.0
2010 7990 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-13 No Incident Encountered 0.00 0.00
2020-02-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References