X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124193505000

Well Details

Well ID: 0124193505000
Loading map...
Location: 00/05-35-012-19W4/0
Location Alias: 00/05-35-12-19 W4M
Location Alias 2: 00/05-35-012-19 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 19
Section: 35
County/Municipality: Lethbridge County
Well Name: SLE RETLAW 5-35-12-19
Operator Name: SanLing Energy Ltd.
License Number: 0082838
License Date: 1980-05-16
License Status: Issued
Spud Date: 1980-05-20
Final Drill Date: 1980-05-30
Well Total Depth: 1160.00 m
Surface Hole Latitude: 50.037384
Surface Hole Longitude: -112.501887

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-16 Obtained License
1980-05-21 Lost Circulation Occurred
1980-05-30 Finished Drilling
1980-05-30 Well Mode changed to Drilled and Cased
1980-05-31 Drill Stem Test Performed
1980-06-01 Drill Stem Test Performed
1980-06-02 Drill Stem Test Performed
1980-06-03 Production Casing Operation Performed
1980-06-03 Rig Released
1980-06-25 Perforation Treatment Performed - Jet Perforation
1980-11-01 Well Began Production
1980-11-01 Well Fluid changed to Crude Oil
1980-11-01 Well Mode changed to Pumping
1981-01-30 Well Fluid changed to Crude Oil
1981-01-30 Well Mode changed to Suspended
1985-04-10 Perforation Treatment Performed - Jet Perforation
1985-04-12 Well Fluid changed to Crude Oil
1985-04-12 Well Mode changed to Flowing
1985-06-25 Well Fluid changed to Crude Oil
1985-06-25 Well Mode changed to Suspended
1993-01-30 Well Log Performed
1993-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-01-31 Well Fluid changed to Crude Oil
1993-01-31 Well Mode changed to Suspended
1993-02-01 Perforation Treatment Performed - Jet Perforation
1993-02-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-25 Perforation 1120.00 1124.00 7
1985-04-10 Perforation 1116.00 1118.50 7
1993-01-31 Packing Device Capped w/Cement 1097.00 1105.00 0
1993-02-01 Perforation 1076.00 1078.80 13
1993-02-01 Perforation 1085.50 1087.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 168 0.0 0.0 0.0
1981 96 0.0 0.0 0.0
1985 1053 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-05-21 Lost Circulation 100.00 100.00

For data sources see[6]

References