X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182906000

Well Details

Well ID: 0124182906000
Loading map...
Location: 00/06-29-012-18W4/0
Location Alias: 00/06-29-12-18 W4M
Location Alias 2: 00/06-29-012-18 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 29
County/Municipality: Municipal District of Taber
Well Name: HOUSTON RETLAW 6-29-12-18
Operator Name: Houston Oil & Gas Ltd.
License Number: 0026964
License Date: 1964-10-13
License Status: Suspension
Spud Date: 1964-10-16
Final Drill Date: 1964-10-23
Well Total Depth: 1114.30 m
Surface Hole Latitude: 50.024348
Surface Hole Longitude: -112.430086

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-10-13 Obtained License
1964-10-23 Finished Drilling
1964-10-23 Well Mode changed to Drilled and Cased
1964-10-24 Drill Stem Test Performed
1964-10-25 Production Casing Operation Performed
1964-10-31 Perforation Treatment Performed - Jet Perforation
1964-11-11 Well Began Production
1964-11-11 Well Fluid changed to Crude Oil
1964-11-11 Well Mode changed to Flowing
1966-02-23 Well Fluid changed to Crude Oil
1966-02-23 Well Mode changed to Pumping
1988-02-24 Perforation Treatment Performed - Jet Perforation
1996-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-23 Perforation Treatment Performed - Cement Squeeze
1997-04-23 Well Log Performed
1997-04-25 Well Log Performed
1997-04-26 Perforation Treatment Performed - Jet Perforation
1997-04-26 Well Log Performed
2004-03-01 Well Fluid changed to Crude Oil
2004-03-01 Well Mode changed to Suspended
2010-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-27 Plug Back Performed
2010-09-27 Well Fluid changed to Crude Oil
2010-09-27 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-10-31 Perforation 1094.80 1096.10 13
1988-02-24 Perforation 1094.80 1096.10 13
1988-02-24 Perforation 1093.00 1093.60 13
1988-02-24 Perforation 1086.30 1090.00 13
1996-10-22 Acid Treatment 1094.80 1096.10 0
1997-04-23 Cement Squeeze 1086.30 1096.10 0
1997-04-26 Perforation 1088.10 1089.00 13
2010-09-27 Packing Device Capped w/Cement 1075.00 1083.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1373 0.0 0.0 0.0
1968 7983 0.0 0.0 0.0
1969 8532 0.0 0.0 0.0
1970 8759 0.0 0.0 0.0
1971 8722 0.0 0.0 0.0
1972 8653 0.0 0.0 0.0
1973 8631 0.0 0.0 0.0
1974 8586 0.0 0.0 0.0
1975 7392 0.0 0.0 0.0
1976 7884 0.0 0.0 0.0
1977 8304 0.0 0.0 0.0
1978 6581 0.0 0.0 0.0
1979 8418 0.0 0.0 0.0
1980 8258 0.0 0.0 0.0
1981 7987 0.0 0.0 0.0
1982 6967 0.0 0.0 0.0
1983 8526 0.0 0.0 0.0
1984 7922 0.0 0.0 0.0
1985 7743 0.0 0.0 0.0
1986 8469 0.0 0.0 0.0
1987 8680 0.0 0.0 0.0
1988 8366 0.0 0.0 0.0
1989 7874 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8403 0.0 0.0 0.0
1992 8615 0.0 0.0 0.0
1993 8207 0.0 0.0 0.0
1994 8605 0.0 0.0 0.0
1995 8665 0.0 0.0 0.0
1996 7304 0.0 0.0 0.0
1997 4444 0.0 0.0 0.0
1998 2879 0.0 0.0 0.0
2000 696 0.0 0.0 0.0

For data sources see[5]

References