If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124182710000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.029156,"lon":-112.378569,"icon":""}]} |
Location: 00/10-27-012-18W4/0 | |
Location Alias: 00/10-27-12-18 W4M | |
Location Alias 2: 00/10-27-012-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 18 | |
Section: 27 | |
County/Municipality: Municipal District of Taber | |
Well Name: SLE RETLAW 10-27-12-18 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0040310 | |
License Date: 1971-06-24 | |
License Status: Suspension | |
Spud Date: 1971-06-27 | |
Final Drill Date: 1971-07-04 | |
Well Total Depth: 1135.40 m | |
Surface Hole Latitude: 50.029156 | |
Surface Hole Longitude: -112.378569 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1971-06-24 | Obtained License |
1971-07-03 | Drill Stem Test Performed |
1971-07-04 | Finished Drilling |
1971-07-04 | Production Casing Operation Performed |
1971-07-05 | Drill Stem Test Performed |
1971-10-08 | Perforation Treatment Performed - Jet Perforation |
1972-03-01 | Well Mode changed to Drilled and Cased |
1979-08-06 | Perforation Treatment Performed - Jet Perforation |
1979-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-08-24 | Well Mode changed to Drilled and Cased |
1980-01-31 | Well Began Production |
1980-01-31 | Well Fluid changed to Gas |
1980-01-31 | Well Mode changed to Flowing |
1988-08-31 | Well Log Performed |
1992-12-31 | Well Fluid changed to Gas |
1992-12-31 | Well Mode changed to Suspended |
2007-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-09-30 | Plug Back Performed |
2007-09-30 | Well Fluid changed to Gas |
2007-09-30 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1971-10-08 | Perforation | 1067.40 | 1069.20 | 7 |
1979-08-06 | Perforation | 1066.80 | 1068.60 | 13 |
1979-08-06 | Perforation | 1101.50 | 1102.80 | 13 |
1979-08-10 | Packing Device Capped w/Cement | 1092.00 | 1092.00 | 0 |
2007-09-30 | Packing Device Capped w/Cement | 1053.40 | 1061.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 6989 | 0.0 | 0.0 | 0.0 |
1981 | 4516 | 0.0 | 0.0 | 0.0 |
1982 | 6942 | 0.0 | 0.0 | 0.0 |
1983 | 7854 | 0.0 | 0.0 | 0.0 |
1984 | 5856 | 0.0 | 0.0 | 0.0 |
1985 | 4809 | 0.0 | 0.0 | 0.0 |
1986 | 5045 | 0.0 | 0.0 | 0.0 |
1987 | 1647 | 0.0 | 0.0 | 0.0 |
1988 | 2131 | 0.0 | 0.0 | 0.0 |
1989 | 4237 | 0.0 | 0.0 | 0.0 |
1990 | 181 | 0.0 | 0.0 | 0.0 |
1992 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]