If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124182508002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.025694,"lon":-112.329945,"icon":""}]} |
Location: 00/08-25-012-18W4/2 | |
Location Alias: 00/08-25-12-18 W4M | |
Location Alias 2: 00/08-25-012-18 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 18 | |
Section: 25 | |
County/Municipality: Municipal District of Taber | |
Well Name: SLE RETLAW 8-25-12-18 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0078281 | |
License Date: 1979-09-26 | |
License Status: Suspension | |
Spud Date: 1979-09-27 | |
Final Drill Date: 1979-10-01 | |
Well Total Depth: 1125.00 m | |
Surface Hole Latitude: 50.025694 | |
Surface Hole Longitude: -112.329945 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-09-26 | Obtained License |
1979-10-01 | Finished Drilling |
1979-10-01 | Well Log Performed |
1979-10-01 | Well Mode changed to Drilled and Cased |
1979-10-02 | Drill Stem Test Performed |
1979-10-03 | Drill Stem Test Performed |
1979-10-04 | Production Casing Operation Performed |
1979-10-12 | Perforation Treatment Performed - Jet Perforation |
1981-10-12 | Perforation Treatment Performed - Jet Perforation |
1982-05-03 | Well Began Production |
1982-05-03 | Well Fluid changed to Gas |
1982-05-03 | Well Mode changed to Flowing |
1983-08-01 | Well Fluid changed to Gas |
1983-08-01 | Well Mode changed to Suspended |
1987-01-06 | Well Fluid changed to Gas |
1987-01-06 | Well Mode changed to Abandoned Zone |
1987-06-06 | Perforation Treatment Performed - Cement Squeeze |
1987-06-06 | Plug Back Performed |
1987-06-08 | Perforation Treatment Performed - Jet Perforation |
2009-07-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-07-21 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-10-12 | Perforation | 1070.00 | 1072.00 | 13 |
1981-10-12 | Perforation | 817.50 | 819.00 | 0 |
1987-06-06 | Cement Squeeze | 817.50 | 819.00 | 0 |
1987-06-08 | Perforation | 1072.00 | 1082.00 | 13 |
1987-06-08 | Perforation | 1082.50 | 1091.50 | 13 |
2009-07-21 | Packing Device Capped w/Cement | 1057.70 | 1065.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 2052 | 0.0 | 0.0 | 0.0 |
For data sources see[5]