X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182306000

Well Details

Well ID: 0124182306000
Loading map...
Location: 00/06-23-012-18W4/0
Location Alias: 00/06-23-12-18 W4M
Location Alias 2: 00/06-23-012-18 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 23
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 6-23-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0077472
License Date: 1979-08-13
License Status: Suspension
Spud Date: 1979-08-28
Final Drill Date: 1979-09-01
Well Total Depth: 1134.00 m
Surface Hole Latitude: 50.007968
Surface Hole Longitude: -112.364633

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-13 Obtained License
1979-09-01 Finished Drilling
1979-09-02 Drill Stem Test Performed
1979-09-03 Drill Stem Test Performed
1979-09-04 Drill Stem Test Performed
1979-09-04 Production Casing Operation Performed
1979-09-23 Well Mode changed to Drilled and Cased
1979-10-01 Perforation Treatment Performed - Jet Perforation
1980-11-15 Well Began Production
1980-11-15 Well Fluid changed to Gas
1980-11-15 Well Mode changed to Flowing
1990-01-01 Well Fluid changed to Gas
1990-01-01 Well Mode changed to Suspended
1991-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-24 Perforation Treatment Performed - Jet Perforation
1991-09-24 Plug Back Performed
1991-09-24 Well Fluid changed to Gas
1991-09-24 Well Mode changed to Abandoned Zone
2008-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-05-22 Perforation Treatment Performed - Jet Perforation
2008-05-30 Perforation Treatment Performed - Cement Squeeze
2008-05-30 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-01 Perforation 1068.00 1070.00 3
1979-10-01 Perforation 1072.00 1077.00 3
1991-09-24 Packing Device Capped w/Cement 1056.00 1064.00 0
1991-09-24 Perforation 817.50 820.00 13
1991-09-24 Perforation 827.50 829.00 13
2008-05-16 Packing Device Capped w/Cement 803.80 811.80 0
2008-05-22 Perforation 9.50 10.00 13
2008-05-30 Cement Squeeze 9.50 10.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 4488 0.0 0.0 0.0
1982 6807 0.0 0.0 0.0
1983 8264 0.0 0.0 0.0
1984 6025 0.0 0.0 0.0
1985 7884 0.0 0.0 0.0
1986 3777 0.0 0.0 0.0
1987 1947 0.0 0.0 0.0
1988 674 0.0 0.0 0.0

For data sources see[5]

References