X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182208000

Well Details

Well ID: 0124182208000
Loading map...
Location: 00/08-22-012-18W4/0
Location Alias: 00/08-22-12-18 W4M
Location Alias 2: 00/08-22-012-18 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 22
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 8-22-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0090157
License Date: 1981-05-14
License Status: Issued
Spud Date: 1981-05-26
Final Drill Date: 1981-06-02
Well Total Depth: 1145.00 m
Surface Hole Latitude: 50.009991
Surface Hole Longitude: -112.375557

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-05-14 Obtained License
1981-05-28 Kick Occurred
1981-06-02 Finished Drilling
1981-06-02 Well Mode changed to Drilled and Cased
1981-06-04 Drill Stem Test Performed
1981-06-05 Production Casing Operation Performed
1981-07-01 Perforation Treatment Performed - Jet Perforation
1981-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-18 Well Began Injection
1981-11-18 Well Fluid changed to Water
1981-11-18 Well Type changed to Disposal
1982-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-07 Perforation Treatment Performed - Cement Squeeze
1983-01-07 Well Fluid changed to Water
1983-01-07 Well Type changed to Disposal
1997-10-31 Well Fluid changed to Water
1997-10-31 Well Mode changed to Suspended
1997-10-31 Well Type changed to Disposal
1997-12-09 Well Log Performed
1999-04-14 Well Log Performed
1999-05-13 Well Fluid changed to Water
1999-05-13 Well Mode changed to Suspended
1999-05-13 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-01 Perforation 1135.00 1141.00 13
1981-07-01 Perforation 814.00 815.00 13
1981-09-13 Acid Treatment 1135.00 1141.00 0
1982-09-05 Acid Treatment 1135.00 1141.00 0
1983-01-07 Cement Squeeze 814.00 815.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-05-28 Kick 739.00 767.00

For data sources see[6]

References