X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182108000

Well Details

Well ID: 0124182108000
Loading map...
Location: 00/08-21-012-18W4/0
Location Alias: 00/08-21-12-18 W4M
Location Alias 2: 00/08-21-012-18 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 21
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 8-21-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0064425
License Date: 1977-06-21
License Status: Suspension
Spud Date: 1977-07-03
Final Drill Date: 1977-07-09
Well Total Depth: 1113.70 m
Surface Hole Latitude: 50.010997
Surface Hole Longitude: -112.396998

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-21 Obtained License
1977-07-09 Finished Drilling
1977-07-09 Well Mode changed to Drilled and Cased
1977-07-10 Drill Stem Test Performed
1977-07-11 Drill Stem Test Performed
1977-07-11 Production Casing Operation Performed
1977-08-05 Perforation Treatment Performed - Jet Perforation
1977-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-11 Perforation Treatment Performed - Bullet Perforation
1977-08-20 Well Began Production
1977-08-20 Well Fluid changed to Crude Oil
1977-08-20 Well Mode changed to Pumping
1977-10-15 Well Fluid changed to Crude Oil
1977-10-15 Well Mode changed to Suspended
1980-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-06-13 Perforation Treatment Performed - Jet Perforation
1980-06-13 Well Fluid changed to Crude Oil
1980-06-13 Well Mode changed to Abandoned Zone
1983-09-23 Perforation Treatment Performed - Cement Squeeze
1983-10-28 Well Log Performed
1995-05-17 Perforation Treatment Performed - Jet Perforation
1995-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-18 Perforation Treatment Performed - Cement Squeeze
1995-05-25 Perforation Treatment Performed - Jet Perforation
1995-05-25 Well Log Performed
1995-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-02 Well Log Performed
1999-12-22 Perforation Treatment Performed - Chemical Squeeze
1999-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-12 Well Log Performed
2000-10-14 Perforation Treatment Performed - Jet Perforation
2000-10-31 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-05 Perforation 1091.20 1094.20 7
1995-05-18 Cement Squeeze 854.70 855.90 0
1995-05-25 Perforation 1063.70 1068.30 20
1995-05-26 Acid Treatment 1063.70 1068.30 0
1999-12-22 Chemical Squeeze 1063.70 1069.20 0
1999-12-23 Acid Treatment 1063.70 1069.20 0
2000-10-14 Perforation 1063.70 1068.30 13
1977-08-07 Acid Treatment 1091.20 1094.20 0
1977-08-11 Bullet Perforation 854.70 855.90 7
1980-06-12 Packing Device Capped w/Cement 1088.00 1088.00 0
1980-06-13 Perforation 1063.80 1065.90 7
1980-06-13 Perforation 1066.80 1068.30 7
1983-09-23 Cement Squeeze 854.70 855.90 0
1995-05-17 Perforation 854.70 855.90 6
1995-05-18 Acid Treatment 854.70 855.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 900 0.0 0.0 0.0
1978 592 0.0 0.0 0.0

For data sources see[5]

References