X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182014003

Well Details

Well ID: 0124182014003
Loading map...
Location: 00/14-20-012-18W4/3
Location Alias: 00/14-20-12-18 W4M
Location Alias 2: 00/14-20-012-18 W4/03
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 20
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 14-20-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0077471
License Date: 1979-08-13
License Status: Issued
Spud Date: 1979-08-22
Final Drill Date: 1979-08-25
Well Total Depth: 1133.00 m
Surface Hole Latitude: 50.015791
Surface Hole Longitude: -112.428492

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-13 Obtained License
1979-08-25 Finished Drilling
1979-08-25 Well Log Performed
1979-08-25 Well Mode changed to Drilled and Cased
1979-08-26 Drill Stem Test Performed
1979-08-27 Drill Stem Test Performed
1979-08-28 Production Casing Operation Performed
1979-09-23 Perforation Treatment Performed - Jet Perforation
1979-10-09 Perforation Treatment Performed - Jet Perforation
1980-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-11 Perforation Treatment Performed - Cement Squeeze
2000-07-11 Plug Back Performed
2000-07-12 Perforation Treatment Performed - Jet Perforation
2001-06-08 Well Log Performed
2003-05-16 Perforation Treatment Performed - Jet Perforation
2003-06-01 Well Began Production
2003-06-01 Well Fluid changed to Gas
2003-06-01 Well Mode changed to Flowing
2008-04-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-23 Perforation 1091.50 1093.00 13
1979-10-09 Perforation 1070.50 1072.00 13
1980-08-07 Packing Device Capped w/Cement 1080.00 1085.00 0
2000-07-11 Cement Squeeze 1070.50 1072.00 0
2000-07-12 Perforation 1091.50 1093.00 13
2003-05-16 Perforation 978.00 980.00 17
2003-05-16 Perforation 973.00 975.00 17
2003-05-16 Perforation 964.00 966.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 3838 0.0 0.0 0.0
2004 8560 0.0 0.0 0.0
2005 7908 0.0 0.0 0.0
2006 8647 0.0 0.0 0.0
2007 8655 0.0 0.0 0.0
2008 7064 0.0 0.0 0.0
2009 8575 0.0 0.0 0.0
2010 8496 0.0 0.0 0.0
2011 8211 0.0 0.0 0.0
2012 8555 0.0 0.0 0.0
2013 8314 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8758 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References