X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124181906000

Well Details

Well ID: 0124181906000
Loading map...
Location: 00/06-19-012-18W4/0
Location Alias: 00/06-19-12-18 W4M
Location Alias 2: 00/06-19-012-18 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 19
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 6-19-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0107870
License Date: 1984-06-25
License Status: Issued
Spud Date: 1984-06-28
Final Drill Date: 1984-07-03
Well Total Depth: 1145.00 m
Surface Hole Latitude: 50.008179
Surface Hole Longitude: -112.454959

For data sources see[1][2]

Well History

Date Event
1984-06-25 Obtained License
1984-06-28 Surface Casing Operation Performed
1984-07-03 Finished Drilling
1984-07-04 Well Log Performed
1984-07-06 Drill Stem Test Performed
1984-07-06 Well Log Performed
1984-07-08 Kick Occurred
1984-07-09 Production Casing Operation Performed
1984-07-09 Rig Released
1984-07-13 Well Log Performed
1984-07-25 Perforation Treatment Performed - Jet Perforation
1984-07-25 Well Log Performed
1984-07-26 Perforation Treatment Performed - Cement Squeeze
1984-07-26 Perforation Treatment Performed - Jet Perforation
1984-07-27 Perforation Treatment Performed - Acid Wash - No Pressure
1984-07-27 Perforation Treatment Performed - Cement Squeeze
1984-07-28 Well Log Performed
1984-07-31 Perforation Treatment Performed - Jet Perforation
1984-07-31 Well Log Performed
1984-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-08 Perforation Treatment Performed - Jet Perforation
1984-09-08 Well Log Performed
1984-10-15 Well Mode changed to Drilled and Cased
1984-12-21 Well Began Production
1984-12-21 Well Fluid changed to Gas
1984-12-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-25 Perforation 690.00 691.00 12
1984-07-26 Cement Squeeze 690.00 691.00 0
1984-07-26 Perforation 400.00 400.50 12
1984-07-27 Acid Wash 400.00 400.50 0
1984-07-27 Cement Squeeze 400.00 400.50 0
1984-07-31 Perforation 1094.00 1094.50 13
1984-09-06 Acid Treatment 1094.00 1094.50 0
1984-09-08 Perforation 1066.50 1068.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 349 0.0 0.0 0.0
1985 8025 0.0 0.0 0.0
1986 7945 0.0 0.0 0.0
1987 8326 0.0 0.0 0.0
1988 7611 0.0 0.0 0.0
1989 6669 0.0 0.0 0.0
1990 5193 0.0 0.0 0.0
1991 7935 0.0 0.0 0.0
1992 8463 0.0 0.0 0.0
1993 8364 0.0 0.0 0.0
1994 8599 0.0 0.0 0.0
1995 6754 0.0 0.0 0.0
1996 8683 0.0 0.0 0.0
1997 8590 0.0 0.0 0.0
1998 8572 0.0 0.0 0.0
1999 8590 0.0 0.0 0.0
2000 8322 0.0 0.0 0.0
2001 8727 0.0 0.0 0.0
2002 8640 0.0 0.0 0.0
2003 8479 0.0 0.0 0.0
2004 8121 0.0 0.0 0.0
2005 8429 0.0 0.0 0.0
2006 8485 0.0 0.0 0.0
2007 8253 0.0 0.0 0.0
2008 8530 0.0 0.0 0.0
2009 8617 0.0 0.0 0.0
2010 8584 0.0 0.0 0.0
2011 8730 0.0 0.0 0.0
2012 8601 0.0 0.0 0.0
2013 8551 0.0 0.0 0.0
2014 8654 0.0 0.0 0.0
2015 8750 0.0 0.0 0.0
2016 8761 0.0 0.0 0.0
2017 8729 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-07-08 Kick 1145.00 1145.00

For data sources see[6]

References