X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124180915002

Well Details

Well ID: 0124180915002
Loading map...
Location: 00/15-09-012-18W4/2
Location Alias: 00/15-09-12-18 W4M
Location Alias 2: 00/15-09-012-18 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 09
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 15-9-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0207661
License Date: 1997-10-28
License Status: Suspension
Spud Date: 1997-10-31
Final Drill Date: 1997-11-04
Well Total Depth: 1133.00 m
Surface Hole Latitude: 49.988732
Surface Hole Longitude: -112.403068

For data sources see[1][2]

Well History

Date Event
1997-10-28 Obtained License
1997-11-01 Surface Casing Operation Performed
1997-11-03 Well Log Performed
1997-11-04 Finished Drilling
1997-11-04 Kick Occurred
1997-11-04 Well Log Performed
1997-11-04 Well Mode changed to Drilled and Cased
1997-11-05 Production Casing Operation Performed
1997-11-05 Rig Released
1997-12-08 Perforation Treatment Performed - Jet Perforation
1997-12-08 Well Log Performed
1997-12-11 Perforation Treatment Performed - Fractured
2003-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-23 Plug Back Performed
2003-06-23 Well Log Performed
2009-03-17 Perforation Treatment Performed - Jet Perforation
2009-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-20 Perforation Treatment Performed - Cement Squeeze
2009-03-20 Plug Back Performed
2009-03-23 Perforation Treatment Performed - Jet Perforation
2009-04-21 Well Began Production
2009-04-21 Well Fluid changed to Gas
2009-04-21 Well Mode changed to Flowing
2009-08-10 Perforation Treatment Performed - Casing Patch (Over Perfs)
2009-08-10 Perforation Treatment Performed - Jet Perforation
2016-04-15 Well Fluid changed to Gas
2016-04-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-12-08 Perforation 1062.00 1064.00 18
2009-08-10 Casing Patch 1062.00 1064.00 0
1997-12-11 Fracture 1062.00 1064.00 0
2003-06-23 Packing Device Capped w/Cement 1055.00 1056.00 0
2009-03-17 Perforation 1062.00 1064.00 17
2009-03-19 Acid Treatment 1062.00 1064.00 0
2009-03-20 Cement Squeeze 1062.00 1064.00 0
2009-03-23 Perforation 1090.00 1091.00 17
2009-03-23 Perforation 1096.00 1097.00 17
2009-08-10 Perforation 1062.00 1064.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5258 0.0 0.0 0.0
2010 8336 0.0 0.0 0.0
2011 8684 0.0 0.0 0.0
2012 4741 0.0 0.0 0.0
2013 3071 0.0 0.0 0.0
2014 1704 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-11-04 Kick 1133.00 1133.00

For data sources see[6]

References