X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124180910002

Well Details

Well ID: 0124180910002
Loading map...
Location: 00/10-09-012-18W4/2
Location Alias: 00/10-09-12-18 W4M
Location Alias 2: 00/10-09-012-18 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 09
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 10-9-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0039573
License Date: 1971-01-14
License Status: Issued
Spud Date: 1971-01-18
Final Drill Date: 1971-01-24
Well Total Depth: 1125.60 m
Surface Hole Latitude: 49.985033
Surface Hole Longitude: -112.400982

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-01-14 Obtained License
1971-01-24 Finished Drilling
1971-01-24 Well Mode changed to Drilled and Cased
1971-01-25 Drill Stem Test Performed
1971-01-26 Drill Stem Test Performed
1971-01-27 Drill Stem Test Performed
1971-01-29 Production Casing Operation Performed
1971-02-06 Perforation Treatment Performed - Jet Perforation
1971-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-12 Perforation Treatment Performed - Jet Perforation
1971-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-14 Well Began Production
1971-02-14 Well Fluid changed to Crude Oil
1971-02-14 Well Mode changed to Pumping
1973-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-07-28 Well Fluid changed to Crude Oil
1973-07-28 Well Mode changed to Pumping
1973-08-01 Well Fluid changed to Crude Oil
1973-08-01 Well Mode changed to Suspended
1981-10-28 Perforation Treatment Performed - Jet Perforation
1982-01-08 Well Fluid changed to Crude Oil
1982-01-08 Well Mode changed to Pumping
1983-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-07 Well Log Performed
1996-10-08 Perforation Treatment Performed - Jet Perforation
1996-10-08 Well Log Performed
1996-12-22 Well Began Injection
1996-12-22 Well Fluid changed to Water
1996-12-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-02-06 Perforation 1098.50 1099.70 10
1971-02-07 Acid Treatment 1098.50 1099.70 0
1971-02-12 Perforation 1063.80 1066.20 0
1971-02-13 Acid Treatment 1063.80 1066.20 0
1973-07-28 Packing Device Capped w/Cement 1082.00 1094.20 0
1981-10-28 Perforation 1064.00 1066.00 13
1981-10-28 Perforation 1068.50 1070.00 13
1983-02-16 Packing Device Capped w/Cement 1079.00 1081.50 0
1996-10-08 Perforation 1064.00 1066.00 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 1238 0.0 0.0 0.0
1972 1710 0.0 0.0 0.0
1982 1994 0.0 0.0 0.0
1983 234 0.0 0.0 0.0
1984 2182 0.0 0.0 0.0
1985 2176 0.0 0.0 0.0
1986 5447 0.0 0.0 0.0
1987 1560 0.0 0.0 0.0
1988 2612 0.0 0.0 0.0
1989 6847 0.0 0.0 0.0
1990 6705 0.0 0.0 0.0
1991 7361 0.0 0.0 0.0
1992 7108 0.0 0.0 0.0
1993 7190 0.0 0.0 0.0
1994 7487 0.0 0.0 0.0
1995 7885 0.0 0.0 0.0
1996 3943 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References