X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124180910000

Well Details

Well ID: 0124180910000
Loading map...
Location: 00/10-09-012-18W4/0
Location Alias: 00/10-09-12-18 W4M
Location Alias 2: 00/10-09-012-18 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 09
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 10-9-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0039573
License Date: 1971-01-14
License Status: Issued
Spud Date: 1971-01-18
Final Drill Date: 1971-01-24
Well Total Depth: 1125.60 m
Surface Hole Latitude: 49.985033
Surface Hole Longitude: -112.400982

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-01-14 Obtained License
1971-01-24 Finished Drilling
1971-01-24 Well Mode changed to Drilled and Cased
1971-01-25 Drill Stem Test Performed
1971-01-26 Drill Stem Test Performed
1971-01-27 Drill Stem Test Performed
1971-01-29 Production Casing Operation Performed
1971-02-06 Perforation Treatment Performed - Jet Perforation
1971-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-08 Well Began Production
1971-02-08 Well Fluid changed to Crude Oil
1971-02-08 Well Mode changed to Pumping
1971-02-12 Perforation Treatment Performed - Jet Perforation
1971-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-14 Well Fluid changed to Crude Oil
1971-02-14 Well Mode changed to Pumping
1973-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-07-28 Well Fluid changed to Crude Oil
1973-07-28 Well Mode changed to Abandoned Zone
1981-10-28 Perforation Treatment Performed - Jet Perforation
1983-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-07 Well Log Performed
1996-10-08 Perforation Treatment Performed - Jet Perforation
1996-10-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-02-06 Perforation 1098.50 1099.70 10
1971-02-07 Acid Treatment 1098.50 1099.70 0
1971-02-12 Perforation 1063.80 1066.20 0
1971-02-13 Acid Treatment 1063.80 1066.20 0
1973-07-28 Packing Device Capped w/Cement 1082.00 1094.20 0
1981-10-28 Perforation 1064.00 1066.00 13
1981-10-28 Perforation 1068.50 1070.00 13
1983-02-16 Packing Device Capped w/Cement 1079.00 1081.50 0
1996-10-08 Perforation 1064.00 1066.00 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 887 0.0 0.0 0.0

For data sources see[5]

References