X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124162016000

Well Details

Well ID: 0124162016000
Loading map...
Location: 00/16-20-012-16W4/0
Location Alias: 00/16-20-12-16 W4M
Location Alias 2: 00/16-20-012-16 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 16
Section: 20
County/Municipality: Municipal District of Taber
Well Name: SLE ENCHANT 16-20-12-16
Operator Name: SanLing Energy Ltd.
License Number: 0114491
License Date: 1985-05-09
License Status: Abandoned
Spud Date: 1985-05-13
Final Drill Date: 1985-05-28
Well Total Depth: 1761.00 m
Surface Hole Latitude: 50.017280
Surface Hole Longitude: -112.147985

For data sources see[1][2]

Well History

Date Event
1985-05-09 Obtained License
1985-05-14 Surface Casing Operation Performed
1985-05-17 Well Log Performed
1985-05-28 Finished Drilling
1985-05-29 Plug Back Performed
1985-05-29 Well Log Performed
1985-05-30 Production Casing Operation Performed
1985-05-30 Rig Released
1985-06-10 Well Log Performed
1985-06-11 Perforation Treatment Performed - Jet Perforation
1985-06-11 Well Log Performed
1985-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-13 Plug Back Performed
1985-06-13 Well Log Performed
1985-06-14 Perforation Treatment Performed - Jet Perforation
1985-06-14 Well Log Performed
1985-06-14 Well Mode changed to Drilled and Cased
1986-10-01 Well Began Production
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Flowing
1991-06-28 Well Fluid changed to Crude Oil
1991-06-28 Well Mode changed to Pumping
1995-05-13 Perforation Treatment Performed - Cement Squeeze
1995-05-13 Plug Back Performed
1995-05-13 Well Fluid changed to Crude Oil
1995-05-13 Well Mode changed to Abandoned Zone
1995-05-15 Perforation Treatment Performed - Jet Perforation
1995-05-17 Perforation Treatment Performed - Fractured
1996-02-22 Well Log Performed
1996-02-23 Perforation Treatment Performed - Casing Patch (Over Perfs)
2017-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-29 Plug Back Performed
2017-10-29 Well Log Performed
2017-11-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-11 Perforation 1392.00 1395.70 13
1985-06-13 Packing Device Capped w/Cement 1382.00 1390.00 0
1985-06-14 Perforation 989.00 994.00 13
1995-05-13 Cement Squeeze 989.00 994.00 0
1995-05-15 Perforation 1392.00 1395.70 13
1995-05-17 Fracture 1392.00 1395.70 0
1996-02-23 Casing Patch 989.00 994.00 0
2017-10-29 Packing Device Capped w/Cement 972.00 980.00 0
2017-10-29 Packing Device Capped w/Cement 1370.00 1378.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1865 0.0 0.0 0.0
1987 7371 0.0 0.0 0.0
1988 8495 0.0 0.0 0.0
1989 8223 0.0 0.0 0.0
1990 8482 0.0 0.0 0.0
1991 4480 0.0 0.0 0.0
1992 5698 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References