X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124161912000

Well Details

Well ID: 0124161912000
Loading map...
Location: 00/12-19-012-16W4/0
Location Alias: 00/12-19-12-16 W4M
Location Alias 2: 00/12-19-012-16 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 16
Section: 19
County/Municipality: Municipal District of Taber
Well Name: SUMMIT ET AL ENCHANT 12-19-12-16
Operator Name: Paramount Resources Ltd.
License Number: 0150939
License Date: 1991-12-09
License Status: RecCertified
Spud Date: 1991-12-12
Final Drill Date: 1991-12-17
Well Total Depth: 1059.00 m
Surface Hole Latitude: 50.013957
Surface Hole Longitude: -112.187646

For data sources see[1][2]

Well History

Date Event
1991-12-09 Obtained License
1991-12-13 Surface Casing Operation Performed
1991-12-13 Well Log Performed
1991-12-16 Drill Stem Test Performed
1991-12-16 Well Log Performed
1991-12-17 Drill Stem Test Performed
1991-12-17 Finished Drilling
1991-12-17 Well Mode changed to Drilled and Cased
1991-12-18 Production Casing Operation Performed
1991-12-18 Rig Released
1992-01-06 Well Log Performed
1992-01-10 Perforation Treatment Performed - Jet Perforation
1992-01-10 Well Log Performed
1992-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-12 Perforation Treatment Performed - Cement Squeeze
1992-01-19 Perforation Treatment Performed - Selective Jet Perforations
1992-01-19 Well Log Performed
1992-02-01 Well Began Production
1992-02-01 Well Fluid changed to Crude Oil
1992-02-01 Well Mode changed to Pumping
1993-04-01 Well Fluid changed to Crude Oil
1993-04-01 Well Mode changed to Suspended
1996-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-10 Plug Back Performed
1996-02-10 Well Abandoned
1996-02-10 Well Fluid changed to Crude Oil
1996-02-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-01-10 Perforation 1019.50 1020.50 14
1992-01-11 Acid Treatment 1019.50 1020.50 0
1992-01-12 Cement Squeeze 1019.50 1020.50 0
1992-01-19 Selective Jet Perforations 1021.00 1021.00 0
1996-02-10 Packing Device Capped w/Cement 1002.00 1010.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5369 0.0 0.0 0.0

For data sources see[5]

References