X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124161015002

Well Details

Well ID: 0124161015002
Loading map...
Location: 00/15-10-012-16W4/2
Location Alias: 00/15-10-12-16 W4M
Location Alias 2: 00/15-10-012-16 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 16
Section: 10
County/Municipality: Municipal District of Taber
Well Name: SLE ENCHANT 15-10-12-16
Operator Name: SanLing Energy Ltd.
License Number: 0156673
License Date: 1993-02-22
License Status: Issued
Spud Date: 1993-03-18
Final Drill Date: 1993-03-22
Well Total Depth: 1012.00 m
Surface Hole Latitude: 49.987680
Surface Hole Longitude: -112.104254

For data sources see[1][2]

Well History

Date Event
1993-02-22 Obtained License
1993-03-19 Surface Casing Operation Performed
1993-03-21 Kick Occurred
1993-03-22 Finished Drilling
1993-03-22 Well Log Performed
1993-03-22 Well Mode changed to Drilled and Cased
1993-03-23 Production Casing Operation Performed
1993-03-24 Rig Released
1993-04-04 Perforation Treatment Performed - Jet Perforation
1993-04-05 Well Log Performed
1993-04-06 Well Log Performed
1993-04-07 Perforation Treatment Performed - Jet Perforation
1993-04-08 Perforation Treatment Performed - Jet Perforation
1993-04-08 Well Log Performed
1993-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-04-14 Perforation Treatment Performed - Jet Perforation
1999-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-07 Perforation Treatment Performed - Jet Perforation
1999-06-07 Plug Back Performed
1999-06-07 Well Log Performed
1999-06-07 Well Mode changed to Drilled and Cased
1999-06-08 Perforation Treatment Performed - Fractured
1999-11-08 Well Began Production
1999-11-08 Well Fluid changed to Gas
1999-11-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-04-04 Perforation 997.00 999.00 13
1993-04-07 Perforation 993.10 994.10 13
1993-04-08 Perforation 994.00 995.00 13
1993-04-12 Acid Treatment 993.10 995.00 0
1993-04-13 Packing Device Capped w/Cement 993.00 996.00 0
1993-04-14 Perforation 984.00 985.00 13
1999-06-07 Packing Device Capped w/Cement 974.00 982.00 0
1999-06-07 Perforation 622.00 627.00 13
1999-06-08 Fracture 622.00 627.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1352 0.0 0.0 0.0
2000 7671 0.0 0.0 0.0
2001 8542 0.0 0.0 0.0
2002 8637 0.0 0.0 0.0
2003 8481 0.0 0.0 0.0
2004 8331 0.0 0.0 0.0
2005 8635 0.0 0.0 0.0
2006 8026 0.0 0.0 0.0
2007 7757 0.0 0.0 0.0
2008 8382 0.0 0.0 0.0
2009 8688 0.0 0.0 0.0
2010 8620 0.0 0.0 0.0
2011 8737 0.0 0.0 0.0
2012 8709 0.0 0.0 0.0
2013 8498 0.0 0.0 0.0
2014 8511 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8757 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2101 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-03-21 Kick 891.00 891.00

For data sources see[6]

References