X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124111910000

Well Details

Well ID: 0124111910000
Loading map...
Location: 00/10-19-012-11W4/0
Location Alias: 00/10-19-12-11 W4M
Location Alias 2: 00/10-19-012-11 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 11
Section: 19
County/Municipality: Cypress County
Well Name: EAG ET AL BOW ISLAND 10-19-12-11
Operator Name: Cenovus Energy Inc.
License Number: 0098857
License Date: 1982-11-16
License Status: RecCertified
Spud Date: 1982-11-21
Final Drill Date: 1982-11-26
Well Total Depth: 943.00 m
Surface Hole Latitude: 50.012578
Surface Hole Longitude: -111.490677

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-16 Obtained License
1982-11-26 Finished Drilling
1982-11-26 Well Log Performed
1982-11-27 Drill Stem Test Performed
1982-11-28 Production Casing Operation Performed
1982-12-15 Perforation Treatment Performed - Jet Perforation
1982-12-28 Perforation Treatment Performed - Jet Perforation
1982-12-29 Perforation Treatment Performed - Cement Squeeze
1982-12-30 Perforation Treatment Performed - Jet Perforation
1983-01-03 Perforation Treatment Performed - Cement Squeeze
1983-01-05 Perforation Treatment Performed - Jet Perforation
1983-01-07 Well Mode changed to Drilled and Cased
1984-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-24 Perforation Treatment Performed - Jet Perforation
1984-10-24 Well Fluid changed to Crude Oil
1984-10-24 Well Mode changed to Potential
1984-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-25 Plug Back Performed
1984-10-25 Well Fluid changed to Crude Oil
1984-10-25 Well Mode changed to Abandoned
1984-10-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-12-15 Perforation 913.50 916.00 13
1982-12-28 Perforation 918.00 919.00 13
1982-12-29 Cement Squeeze 913.50 919.00 0
1982-12-30 Perforation 913.00 914.00 13
1983-01-03 Cement Squeeze 913.00 914.00 0
1983-01-05 Perforation 913.00 914.00 13
1984-10-23 Packing Device Capped w/Cement 892.00 900.00 0
1984-10-24 Perforation 654.00 657.50 7
1984-10-25 Packing Device Capped w/Cement 641.00 649.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 9 0.0 0.0 0.0
1983 1 0.0 0.0 0.0

For data sources see[5]

References