If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124111910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.012578,"lon":-111.490677,"icon":""}]} |
Location: 00/10-19-012-11W4/0 | |
Location Alias: 00/10-19-12-11 W4M | |
Location Alias 2: 00/10-19-012-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 11 | |
Section: 19 | |
County/Municipality: Cypress County | |
Well Name: EAG ET AL BOW ISLAND 10-19-12-11 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0098857 | |
License Date: 1982-11-16 | |
License Status: RecCertified | |
Spud Date: 1982-11-21 | |
Final Drill Date: 1982-11-26 | |
Well Total Depth: 943.00 m | |
Surface Hole Latitude: 50.012578 | |
Surface Hole Longitude: -111.490677 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-11-16 | Obtained License |
1982-11-26 | Finished Drilling |
1982-11-26 | Well Log Performed |
1982-11-27 | Drill Stem Test Performed |
1982-11-28 | Production Casing Operation Performed |
1982-12-15 | Perforation Treatment Performed - Jet Perforation |
1982-12-28 | Perforation Treatment Performed - Jet Perforation |
1982-12-29 | Perforation Treatment Performed - Cement Squeeze |
1982-12-30 | Perforation Treatment Performed - Jet Perforation |
1983-01-03 | Perforation Treatment Performed - Cement Squeeze |
1983-01-05 | Perforation Treatment Performed - Jet Perforation |
1983-01-07 | Well Mode changed to Drilled and Cased |
1984-10-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-10-24 | Perforation Treatment Performed - Jet Perforation |
1984-10-24 | Well Fluid changed to Crude Oil |
1984-10-24 | Well Mode changed to Potential |
1984-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-10-25 | Plug Back Performed |
1984-10-25 | Well Fluid changed to Crude Oil |
1984-10-25 | Well Mode changed to Abandoned |
1984-10-26 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-12-15 | Perforation | 913.50 | 916.00 | 13 |
1982-12-28 | Perforation | 918.00 | 919.00 | 13 |
1982-12-29 | Cement Squeeze | 913.50 | 919.00 | 0 |
1982-12-30 | Perforation | 913.00 | 914.00 | 13 |
1983-01-03 | Cement Squeeze | 913.00 | 914.00 | 0 |
1983-01-05 | Perforation | 913.00 | 914.00 | 13 |
1984-10-23 | Packing Device Capped w/Cement | 892.00 | 900.00 | 0 |
1984-10-24 | Perforation | 654.00 | 657.50 | 7 |
1984-10-25 | Packing Device Capped w/Cement | 641.00 | 649.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 9 | 0.0 | 0.0 | 0.0 |
1983 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[5]