X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124061006000

Well Details

Well ID: 0124061006000
Loading map...
Location: 00/06-10-012-06W4/0
Location Alias: 00/06-10-12-06 W4M
Location Alias 2: 00/06-10-012-06 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 06
Section: 10
County/Municipality: Cypress County
Well Name: CITY OF MEDICINE HAT 6-10-12-6
Operator Name: City Of Medicine Hat
License Number: 0087506
License Date: 1980-12-05
License Status: Issued
Spud Date: 1981-05-11
Final Drill Date: 1981-05-13
Well Total Depth: 603.00 m
Surface Hole Latitude: 49.980100
Surface Hole Longitude: -110.744535

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-05 Obtained License
1981-05-13 Finished Drilling
1981-05-13 Production Casing Operation Performed
1981-05-13 Well Mode changed to Drilled and Cased
1981-06-05 Perforation Treatment Performed - Bullet Perforation
1981-06-05 Perforation Treatment Performed - Selective Bullet Perforations
1981-06-17 Perforation Treatment Performed - Fractured
1981-06-29 Perforation Treatment Performed - Bullet Perforation
1981-07-07 Well Began Production
1981-07-07 Well Fluid changed to Gas
1981-07-07 Well Mode changed to Flowing
1981-07-22 Perforation Treatment Performed - Fractured
1996-10-01 Well Fluid changed to Gas
1996-10-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-06-05 Bullet Perforation 514.50 516.50 1
1981-06-05 Bullet Perforation 517.00 522.50 2
1981-06-05 Bullet Perforation 523.50 524.50 1
1981-06-05 Selective Bullet Perforations 526.50 531.50 0
1981-06-05 Selective Bullet Perforations 548.00 548.00 0
1981-06-17 Fracture 514.50 548.00 0
1981-06-29 Bullet Perforation 336.00 348.50 2
1981-07-22 Fracture 336.00 348.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1588 0.0 0.0 0.0
1982 5820 0.0 0.0 0.0
1983 4956 0.0 0.0 0.0
1984 5855 0.0 0.0 0.0
1985 7241 0.0 0.0 0.0
1986 4022 0.0 0.0 0.0
1987 4483 0.0 0.0 0.0
1988 8274 0.0 0.0 0.0
1989 5175 0.0 0.0 0.0
1990 8377 0.0 0.0 0.0
1991 6692 0.0 0.0 0.0
1992 6943 0.0 0.0 0.0
1993 8751 0.0 0.0 0.0
1994 8736 0.0 0.0 0.0
1995 8698 0.0 0.0 0.0
1996 8758 0.0 0.0 0.0
1997 8702 0.0 0.0 0.0
1998 8313 0.0 0.0 0.0
1999 8643 0.0 0.0 0.0
2000 8720 0.0 0.0 0.0
2001 8698 0.0 0.0 0.0
2002 8716 0.0 0.0 0.0
2003 8594 0.0 0.0 0.0
2004 8585 0.0 0.0 0.0
2005 8530 0.0 0.0 0.0
2006 8341 0.0 0.0 0.0
2007 8413 0.0 0.0 0.0
2008 8347 0.0 0.0 0.0
2009 8342 0.0 0.0 0.0
2010 7901 0.0 0.0 0.0
2011 5113 0.0 0.0 0.0
2012 8235 0.0 0.0 0.0
2013 8733 0.0 0.0 0.0
2014 8313 0.0 0.0 0.0
2015 7101 0.0 0.0 0.0
2016 8170 0.0 0.0 0.0
2017 8670 0.0 0.0 0.0
2018 8358 0.0 0.0 0.0
2019 6247 0.0 0.0 0.0

For data sources see[5]

References