X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124052716020

Well Details

Well ID: 0124052716020
Loading map...
Location: 02/16-27-012-05W4/0
Location Alias: 02/16-27-12-05 W4M
Location Alias 2: 02/16-27-012-05 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 05
Section: 27
County/Municipality: Cypress County
Well Name: AECOG 102 MEDHAT 16-27-12-5
Operator Name: Enerplus Corporation
License Number: 0123380
License Date: 1986-06-27
License Status: Suspension
Spud Date: 1986-09-24
Final Drill Date: 1986-10-01
Well Total Depth: 863.00 m
Surface Hole Latitude: 50.031984
Surface Hole Longitude: -110.599478

For data sources see[1][2]

Well History

Date Event
1986-06-27 Obtained License
1986-09-24 Surface Casing Operation Performed
1986-10-01 Finished Drilling
1986-10-01 Well Log Performed
1986-10-01 Well Mode changed to Drilled and Cased
1986-10-02 Production Casing Operation Performed
1986-10-02 Rig Released
1986-10-10 Perforation Treatment Performed - Jet Perforation
1986-11-01 Well Began Production
1986-11-01 Well Fluid changed to Crude Oil
1986-11-01 Well Mode changed to Pumping
1999-11-01 Well Fluid changed to Crude Oil
1999-11-01 Well Mode changed to Suspended
2010-01-22 Well Log Performed
2015-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-10 Plug Back Performed
2015-12-10 Well Fluid changed to Crude Oil
2015-12-10 Well Mode changed to Abandoned Zone
2017-10-25 Well Log Performed
2017-12-02 Perforation Treatment Performed - Jet Perforation
2017-12-02 Well Log Performed
2017-12-08 Perforation Treatment Performed - Cement Plug
2018-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-03 Perforation Treatment Performed - Jet Perforation
2018-12-03 Plug Back Performed
2018-12-03 Well Log Performed
2018-12-04 Perforation Treatment Performed - Cement Plug
2018-12-04 Perforation Treatment Performed - Cement Squeeze
2018-12-04 Plug Back Performed
2018-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-05 Perforation Treatment Performed - Jet Perforation
2018-12-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-10-10 Perforation 839.50 843.50 18
2018-12-04 Cement Plug 337.00 345.00 0
2018-12-05 Packing Device Capped w/Cement 267.00 275.00 0
2018-12-05 Perforation 237.00 239.00 41
2018-12-05 Perforation 237.00 239.00 34
2015-12-10 Packing Device Capped w/Cement 653.00 830.00 0
2017-12-02 Perforation 606.00 608.00 20
2017-12-02 Perforation 606.00 608.00 17
2017-12-08 Cement Plug 587.50 595.50 0
2018-12-03 Packing Device Capped w/Cement 367.00 375.00 0
2018-12-03 Perforation 349.00 351.00 41
2018-12-03 Perforation 349.00 351.00 34
2018-12-04 Cement Squeeze 349.00 351.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1416 0.0 0.0 0.0
1987 7086 0.0 0.0 0.0
1988 4372 0.0 0.0 0.0
1989 642 0.0 0.0 0.0
1990 5498 0.0 0.0 0.0
1991 8741 0.0 0.0 0.0
1992 8069 0.0 0.0 0.0
1993 8694 0.0 0.0 0.0
1994 8585 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 6623 0.0 0.0 0.0
1997 8738 0.0 0.0 0.0
1998 456 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-17 No Incident Encountered 0.00 0.00
2017-12-08 No Incident Encountered 0.00 0.00
2018-12-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References