If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124031306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.994527,"lon":-110.292673,"icon":""}]} |
Location: 00/06-13-012-03W4/0 | |
Location Alias: 00/06-13-12-03 W4M | |
Location Alias 2: 00/06-13-012-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 03 | |
Section: 13 | |
County/Municipality: Cypress County | |
Well Name: PANCANA IRV MEDHAT 6-13-12-3 | |
Operator Name: Canada Northwest Energy Limited | |
License Number: 0038918 | |
License Date: 1970-10-02 | |
License Status: RecCertified | |
Spud Date: 1970-10-08 | |
Final Drill Date: 1970-10-10 | |
Well Total Depth: 500.80 m | |
Surface Hole Latitude: 49.994527 | |
Surface Hole Longitude: -110.292673 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1970-10-02 | Obtained License |
1970-10-10 | Finished Drilling |
1970-10-10 | Production Casing Operation Performed |
1970-10-21 | Perforation Treatment Performed - Fractured |
1970-10-21 | Perforation Treatment Performed - Jet Perforation |
1970-10-24 | Well Mode changed to Drilled and Cased |
1971-01-11 | Well Began Production |
1971-01-11 | Well Fluid changed to Gas |
1971-01-11 | Well Mode changed to Flowing |
1972-11-24 | Well Fluid changed to Gas |
1972-11-24 | Well Mode changed to Suspended |
1976-08-29 | Well Fluid changed to Gas |
1976-08-29 | Well Mode changed to Flowing |
1979-01-30 | Well Fluid changed to Gas |
1979-01-30 | Well Mode changed to Suspended |
1989-04-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-04-27 | Plug Back Performed |
1989-04-27 | Well Abandoned |
1989-04-27 | Well Fluid changed to Gas |
1989-04-27 | Well Log Performed |
1989-04-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1970-10-21 | Perforation | 468.50 | 469.40 | 7 |
1970-10-21 | Perforation | 470.30 | 470.90 | 7 |
1970-10-21 | Perforation | 471.80 | 473.00 | 7 |
1970-10-21 | Fracture | 468.50 | 473.00 | 0 |
1989-04-27 | Packing Device Capped w/Cement | 454.50 | 463.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1971 | 2225 | 0.0 | 0.0 | 0.0 |
1976 | 1380 | 0.0 | 0.0 | 0.0 |
1977 | 8084 | 0.0 | 0.0 | 0.0 |
1978 | 7540 | 0.0 | 0.0 | 0.0 |
1979 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]