X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114283610000

Well Details

Well ID: 0114283610000
Loading map...
Location: 00/10-36-011-28W4/0
Location Alias: 00/10-36-11-28 W4M
Location Alias 2: 00/10-36-011-28 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 28
Section: 36
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: ESSO WINDPUMP 10-36-11-28
Operator Name: Imperial Oil Resources Limited
License Number: 0083008
License Date: 1980-05-26
License Status: RecCertified
Spud Date: 1980-06-05
Final Drill Date: 1980-08-26
Well Total Depth: 3215.00 m
Surface Hole Latitude: 49.956917
Surface Hole Longitude: -113.693036

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-26 Obtained License
1980-06-05 Direction Drilling Operation Performed - 98
1980-07-01 Lost Circulation Occurred
1980-07-28 Kick Occurred
1980-07-30 Lost Circulation Occurred
1980-08-26 Finished Drilling
1980-08-26 Well Log Performed
1980-09-14 Perforation Treatment Performed - Jet Perforation
1980-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-21 Perforation Treatment Performed - Jet Perforation
1980-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-04 Perforation Treatment Performed - Cement Squeeze
1980-10-09 Perforation Treatment Performed - Jet Perforation
1980-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-18 Perforation Treatment Performed - Jet Perforation
1980-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-11 Perforation Treatment Performed - Chemical Squeeze
1981-02-21 Perforation Treatment Performed - Fractured
1981-03-19 Perforation Treatment Performed - Jet Perforation
1981-05-14 Well Mode changed to Drilled and Cased
1987-12-14 Well Fluid changed to Crude Oil
1987-12-14 Well Mode changed to Potential
1987-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-12-15 Plug Back Performed
1987-12-15 Well Fluid changed to Crude Oil
1987-12-15 Well Log Performed
1987-12-15 Well Mode changed to Abandoned
1988-01-11 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1980-06-05 486.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-14 Perforation 3145.00 3152.00 7
1980-10-18 Packing Device Capped w/Cement 2867.00 2875.00 0
1980-10-18 Perforation 2576.00 2583.00 6
1980-10-19 Acid Treatment 2576.00 2583.00 0
1980-12-11 Chemical Squeeze 2576.00 2583.00 0
1981-02-21 Fracture 2576.00 2583.00 0
1981-03-19 Perforation 2555.00 2559.00 6
1987-12-15 Packing Device Capped w/Cement 2562.00 2570.00 0
1987-12-15 Packing Device Capped w/Cement 2542.00 2550.00 0
1980-09-17 Acid Treatment 3145.00 3152.00 0
1980-09-20 Packing Device Capped w/Cement 3127.00 3135.00 0
1980-09-21 Perforation 2890.00 2905.00 7
1980-09-22 Acid Treatment 2890.00 2905.00 0
1980-10-04 Cement Squeeze 2890.00 2905.00 0
1980-10-09 Perforation 2893.00 2899.00 0
1980-10-09 Perforation 2894.00 2900.00 0
1980-10-10 Acid Treatment 2893.00 2900.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 96 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-07-01 Lost Circulation 1677.00 1725.00
1980-07-28 Kick 2900.00 2900.00
1980-07-30 Lost Circulation 2914.00 2918.00

For data sources see[7]

References