X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114262401002

Well Details

Well ID: 0114262401002
Loading map...
Location: 00/01-24-011-26W4/2
Location Alias: 00/01-24-11-26 W4M
Location Alias 2: 00/01-24-011-26 W4/02
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 26
Section: 24
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: LTAM GRANUM 15-24-11-26
Operator Name: Long Term Asset Management Inc.
License Number: 0430077
License Date: 2011-01-14
License Status: Suspension
Spud Date: 2011-01-21
Final Drill Date: 2011-03-10
Well Total Depth: 3455.00 m
Surface Hole Latitude: 49.930972
Surface Hole Longitude: -113.420291

For data sources see[1][2]

Well History

Date Event
2011-01-14 Obtained License
2011-02-11 Well Log Performed
2011-02-12 Direction Drilling Operation Performed - Horizontal
2011-02-20 Well Log Performed
2011-02-25 Intermediate Casing Operation Performed
2011-02-28 Well Log Performed
2011-03-10 Finished Drilling
2011-03-10 Well Mode changed to Drilled and Cased
2011-03-11 Production Casing Operation Performed
2011-03-12 Rig Released
2011-03-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-14 Perforation Treatment Performed - Jet Perforation
2011-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-07 Well Began Production
2011-06-07 Well Fluid changed to Crude Oil
2011-06-07 Well Mode changed to Flowing
2011-10-03 Well Log Performed
2012-02-01 Well Log Performed
2017-11-01 Well Fluid changed to Crude Oil
2017-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-12 2037.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-31 Multi-Stage Fracture 3264.00 3389.00 0
2011-04-03 Multi-Stage Fracture 3115.00 3240.00 0
2011-04-03 Multi-Stage Fracture 2965.00 3090.00 0
2011-04-04 Multi-Stage Fracture 2815.00 2940.00 0
2011-04-04 Multi-Stage Fracture 2665.00 2790.00 0
2011-04-05 Multi-Stage Fracture 2430.00 2567.80 0
2011-05-14 Perforation 2625.00 2625.50 17
2011-05-14 Perforation 2605.00 2605.50 17
2011-05-24 Multi-Stage Fracture 2605.00 2625.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4588 0.0 0.0 0.0
2012 5850 0.0 0.0 0.0
2013 1857 0.0 0.0 0.0
2014 8246 0.0 0.0 0.0
2015 6890 0.0 0.0 0.0
2016 3304 0.0 0.0 0.0
2017 864 0.0 0.0 0.0

For data sources see[6]

References