X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114172701000

Well Details

Well ID: 0114172701000
Loading map...
Location: 00/01-27-011-17W4/0
Location Alias: 00/01-27-11-17 W4M
Location Alias 2: 00/01-27-011-17 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 17
Section: 27
County/Municipality: Municipal District of Taber
Well Name: PROVIDENT TURIN 1-27-11-17
Operator Name: Pembina NGL Corporation
License Number: 0099444
License Date: 1982-12-01
License Status: RecCertified
Spud Date: 1982-12-11
Final Drill Date: 1982-12-16
Well Total Depth: 1057.00 m
Surface Hole Latitude: 49.933662
Surface Hole Longitude: -112.237140

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-01 Obtained License
1982-12-16 Finished Drilling
1982-12-16 Well Mode changed to Drilled and Cased
1982-12-17 Well Log Performed
1982-12-18 Drill Stem Test Performed
1982-12-19 Drill Stem Test Performed
1982-12-20 Production Casing Operation Performed
1982-12-28 Perforation Treatment Performed - Jet Perforation
1982-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-30 Perforation Treatment Performed - Cement Squeeze
1982-12-31 Perforation Treatment Performed - Jet Perforation
1983-01-08 Well Began Production
1983-01-08 Well Fluid changed to Crude Oil
1983-01-08 Well Mode changed to Pumping
1983-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-09 Perforation Treatment Performed - Cement Squeeze
1983-04-15 Perforation Treatment Performed - Jet Perforation
1983-04-17 Perforation Treatment Performed - Jet Perforation
1983-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1998-12-15 Well Fluid changed to Crude Oil
1998-12-15 Well Mode changed to Abandoned
2004-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-05-08 Perforation Treatment Performed - Cement Plug
2004-05-08 Plug Back Performed
2004-05-09 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-05-10 Perforation Treatment Performed - Cement Squeeze
2004-05-10 Perforation Treatment Performed - Jet Perforation
2004-05-10 Plug Back Performed
2004-05-13 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-05-14 Perforation Treatment Performed - Cement Squeeze
2004-05-14 Plug Back Performed
2004-06-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-12-28 Perforation 1022.00 1022.80 10
2004-05-08 Cement Plug 1011.00 1014.00 0
2004-05-08 Packing Device Capped w/Cement 1000.00 1008.00 0
2004-05-09 Bridge Plug, No Cement 369.00 370.00 0
2004-05-10 Perforation 351.00 355.00 13
2004-05-10 Cement Squeeze 351.00 355.00 0
2004-05-13 Hydra Jet Perforation 227.00 232.00 1
2004-05-14 Cement Squeeze 227.00 232.00 0
1982-12-29 Acid Treatment 1022.00 1022.80 0
1982-12-30 Cement Squeeze 1022.00 1022.80 0
1982-12-31 Perforation 1017.50 1019.50 7
1983-04-08 Acid Treatment 1017.50 1019.50 0
1983-04-09 Cement Squeeze 1017.50 1019.50 0
1983-04-15 Perforation 1017.00 1018.70 13
1983-04-17 Perforation 1010.00 1012.00 13
1983-04-19 Acid Treatment 1010.00 1012.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 782 0.0 0.0 0.0

For data sources see[5]

References