X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114172201020

Well Details

Well ID: 0114172201020
Loading map...
Location: 02/01-22-011-17W4/0
Location Alias: 02/01-22-11-17 W4M
Location Alias 2: 02/01-22-011-17 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 17
Section: 22
County/Municipality: Municipal District of Taber
Well Name: SLE TURIN 1-22-11-17
Operator Name: SanLing Energy Ltd.
License Number: 0180754
License Date: 1995-09-15
License Status: Suspension
Spud Date: 1995-09-20
Final Drill Date: 1995-09-24
Well Total Depth: 1055.00 m
Surface Hole Latitude: 49.920548
Surface Hole Longitude: -112.238311

For data sources see[1][2]

Well History

Date Event
1995-09-15 Obtained License
1995-09-20 Lost Circulation Occurred
1995-09-21 Surface Casing Operation Performed
1995-09-24 Finished Drilling
1995-09-24 Production Casing Operation Performed
1995-09-24 Well Log Performed
1995-09-24 Well Mode changed to Drilled and Cased
1995-09-25 Rig Released
1995-10-07 Perforation Treatment Performed - Jet Perforation
1995-11-18 Well Began Production
1995-11-18 Well Fluid changed to Crude Oil
1995-11-18 Well Mode changed to Pumping
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
2008-08-11 Perforation Treatment Performed - Jet Perforation
2008-08-11 Well Log Performed
2008-08-13 Perforation Treatment Performed - Jet Perforation
2008-08-13 Well Log Performed
2009-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-04-18 Plug Back Performed
2009-04-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-04-19 Plug Back Performed
2009-04-19 Well Fluid changed to Crude Oil
2009-04-19 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-07 Perforation 1003.80 1009.00 16
2008-08-11 Perforation 1015.50 1019.00 17
2008-08-13 Perforation 1012.00 1014.00 17
2009-04-18 Packing Device Capped w/Cement 1003.50 1011.50 0
2009-04-19 Packing Device Capped w/Cement 987.00 995.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1056 0.0 0.0 0.0
1996 6367 0.0 0.0 0.0
1997 1128 0.0 0.0 0.0
1998 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-09-20 Lost Circulation 44.60 157.00

For data sources see[6]

References