X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114171406000

Well Details

Well ID: 0114171406000
Loading map...
Location: 00/06-14-011-17W4/0
Location Alias: 00/06-14-11-17 W4M
Location Alias 2: 00/06-14-011-17 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 17
Section: 14
County/Municipality: Municipal District of Taber
Well Name: SLE TURIN 6-14-11-17
Operator Name: SanLing Energy Ltd.
License Number: 0037106
License Date: 1969-10-24
License Status: Suspension
Spud Date: 1969-10-31
Final Drill Date: 1969-11-07
Well Total Depth: 1039.40 m
Surface Hole Latitude: 49.907020
Surface Hole Longitude: -112.226792

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-10-24 Obtained License
1969-11-06 Drill Stem Test Performed
1969-11-07 Finished Drilling
1969-11-07 Well Mode changed to Drilled and Cased
1969-11-08 Drill Stem Test Performed
1969-11-09 Production Casing Operation Performed
1969-11-13 Perforation Treatment Performed - Jet Perforation
1969-11-16 Perforation Treatment Performed - Cement Squeeze
1969-11-17 Perforation Treatment Performed - Jet Perforation
1969-11-19 Well Began Production
1969-11-19 Well Fluid changed to Crude Oil
1969-11-19 Well Mode changed to Flowing
1973-11-28 Well Fluid changed to Crude Oil
1973-11-28 Well Mode changed to Pumping
1974-04-09 Perforation Treatment Performed - Jet Perforation
1997-10-31 Well Fluid changed to Crude Oil
1997-10-31 Well Mode changed to Suspended
2000-06-18 Well Fluid changed to Crude Oil
2000-06-18 Well Mode changed to Pumping
2001-01-15 Well Fluid changed to Crude Oil
2001-01-15 Well Mode changed to Suspended
2008-11-02 Perforation Treatment Performed - Jet Perforation
2008-11-02 Well Log Performed
2009-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-14 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-11-13 Perforation 1005.80 1006.40 7
1969-11-13 Perforation 1007.10 1007.40 7
1969-11-16 Cement Squeeze 1005.80 1007.40 0
1969-11-17 Perforation 1002.20 1003.10 13
1974-04-09 Perforation 1002.20 1003.10 7
2008-11-02 Perforation 996.70 999.10 17
2009-09-14 Packing Device Capped w/Cement 979.00 987.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 912 0.0 0.0 0.0
1970 8560 0.0 0.0 0.0
1971 8558 0.0 0.0 0.0
1972 8330 0.0 0.0 0.0
1973 7871 0.0 0.0 0.0
1974 7608 0.0 0.0 0.0
1975 5400 0.0 0.0 0.0
1976 7595 0.0 0.0 0.0
1977 7282 0.0 0.0 0.0
1978 7726 0.0 0.0 0.0
1979 8116 0.0 0.0 0.0
1980 7267 0.0 0.0 0.0
1981 7132 0.0 0.0 0.0
1982 2592 0.0 0.0 0.0
1983 4922 0.0 0.0 0.0
1984 8318 0.0 0.0 0.0
1985 8225 0.0 0.0 0.0
1986 8563 0.0 0.0 0.0
1987 8572 0.0 0.0 0.0
1988 8658 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8759 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8725 0.0 0.0 0.0
1995 4653 0.0 0.0 0.0
1996 24 0.0 0.0 0.0
2000 4157 0.0 0.0 0.0
2001 696 0.0 0.0 0.0

For data sources see[5]

References