X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114163214000

Well Details

Well ID: 0114163214000
Loading map...
Location: 00/14-32-011-16W4/0
Location Alias: 00/14-32-11-16 W4M
Location Alias 2: 00/14-32-011-16 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 16
Section: 32
County/Municipality: Municipal District of Taber
Well Name: RENAISSANCE TABER 14-32-11-16
Operator Name: Husky Oil Operations Limited
License Number: 0157062
License Date: 1993-03-08
License Status: RecCertified
Spud Date: 1993-04-20
Final Drill Date: 1993-04-23
Well Total Depth: 1012.00 m
Surface Hole Latitude: 49.957736
Surface Hole Longitude: -112.157441

For data sources see[1][2]

Well History

Date Event
1993-03-08 Obtained License
1993-04-20 Well Log Performed
1993-04-21 Surface Casing Operation Performed
1993-04-22 Water Flow Occurred
1993-04-23 Finished Drilling
1993-04-23 Lost Circulation Occurred
1993-04-23 Well Mode changed to Drilled and Cased
1993-04-24 Well Log Performed
1993-04-25 Production Casing Operation Performed
1993-04-25 Rig Released
1993-04-25 Well Log Performed
1993-04-30 Well Log Performed
1993-05-01 Perforation Treatment Performed - Jet Perforation
1993-05-01 Perforation Treatment Performed - Remedial Casing
1993-05-01 Well Log Performed
1993-05-04 Perforation Treatment Performed - Jet Perforation
1993-05-04 Well Log Performed
1993-05-15 Well Began Production
1993-05-15 Well Fluid changed to Crude Oil
1993-05-15 Well Mode changed to Pumping
1995-07-01 Well Fluid changed to Crude Oil
1995-07-01 Well Mode changed to Suspended
1995-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-17 Plug Back Performed
1995-10-17 Well Abandoned
1995-10-17 Well Fluid changed to Crude Oil
1995-10-17 Well Log Performed
1995-10-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-05-01 Perforation 580.00 580.30 13
1993-05-01 Remedial Casing Cementing 580.00 580.30 0
1993-05-04 Perforation 996.30 997.30 16
1993-05-04 Perforation 999.00 1000.50 16
1993-05-04 Perforation 1001.00 1001.70 16
1995-10-17 Packing Device Capped w/Cement 982.00 990.00 0
1995-10-17 Packing Device Capped w/Cement 567.00 575.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5427 0.0 0.0 0.0
1994 3280 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-04-22 Water Flow 366.00 1012.00
1993-04-23 Lost Circulation 1012.00 1012.00

For data sources see[6]

References