If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114161803030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.905896,"lon":-112.197039,"icon":""}]} |
Location: 03/03-18-011-16W4/0 | |
Location Alias: 03/03-18-11-16 W4M | |
Location Alias 2: 03/03-18-011-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 16 | |
Section: 18 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL HZ 103 TURIN 3-18-11-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0445597 | |
License Date: 2012-05-02 | |
License Status: Issued | |
Spud Date: 2012-06-08 | |
Final Drill Date: 2012-06-14 | |
Well Total Depth: 2219.00 m | |
Surface Hole Latitude: 49.905896 | |
Surface Hole Longitude: -112.197039 |
Date | Event |
---|---|
2012-05-02 | Obtained License |
2012-06-10 | Direction Drilling Operation Performed - Deviate |
2012-06-10 | Surface Casing Operation Performed |
2012-06-10 | Well Log Performed |
2012-06-11 | Direction Drilling Operation Performed - Horizontal |
2012-06-14 | Finished Drilling |
2012-06-14 | Well Mode changed to Drilled and Cased |
2012-06-15 | Production Casing Operation Performed |
2012-06-16 | Rig Released |
2012-06-18 | Well Log Performed |
2012-07-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-04 | Well Fluid changed to Crude Oil |
2012-08-04 | Well Mode changed to Potential |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Pumping |
2014-06-30 | Well Fluid changed to Crude Oil |
2014-06-30 | Well Mode changed to Suspended |
2016-10-19 | Perforation Treatment Performed - Jet Perforation |
2016-12-01 | Well Fluid changed to Crude Oil |
2016-12-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-06-08 | Champion Drilling Inc. | 350 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-10 | 740.00 | Deviate (5 - 79 degrees) |
2012-06-11 | 1072.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-05 | Multi-Stage Fracture | 2190.00 | 2190.10 | 0 |
2012-07-05 | Multi-Stage Fracture | 1509.70 | 1509.80 | 0 |
2012-07-05 | Multi-Stage Fracture | 1439.00 | 1439.10 | 0 |
2012-07-05 | Multi-Stage Fracture | 1354.90 | 1355.00 | 0 |
2012-07-05 | Multi-Stage Fracture | 1285.70 | 1285.80 | 0 |
2012-07-05 | Multi-Stage Fracture | 1217.20 | 1217.30 | 0 |
2012-07-05 | Multi-Stage Fracture | 1133.90 | 1134.00 | 0 |
2016-10-19 | Perforation | 1217.20 | 1218.20 | 13 |
2016-10-19 | Perforation | 1439.00 | 1440.00 | 13 |
2016-10-19 | Perforation | 1539.70 | 1540.70 | 13 |
2012-07-05 | Multi-Stage Fracture | 2105.60 | 2105.70 | 0 |
2012-07-05 | Multi-Stage Fracture | 2023.00 | 2023.10 | 0 |
2012-07-05 | Multi-Stage Fracture | 1952.20 | 1952.30 | 0 |
2012-07-05 | Multi-Stage Fracture | 1883.30 | 1883.40 | 0 |
2012-07-05 | Multi-Stage Fracture | 1815.00 | 1815.10 | 0 |
2012-07-05 | Multi-Stage Fracture | 1733.40 | 1733.50 | 0 |
2012-07-05 | Multi-Stage Fracture | 1664.10 | 1664.20 | 0 |
2012-07-05 | Multi-Stage Fracture | 1593.70 | 1593.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3289 | 0.0 | 0.0 | 0.0 |
2013 | 4882 | 0.0 | 0.0 | 0.0 |
2016 | 444 | 0.0 | 0.0 | 0.0 |
2017 | 8225 | 0.0 | 0.0 | 0.0 |
2018 | 8021 | 0.0 | 0.0 | 0.0 |
2019 | 6511 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-16 | No Incident Encountered | 0.00 | 0.00 |
2012-07-30 | No Incident Encountered | 0.00 | 0.00 |
2017-02-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]