X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114161803030

Well Details

Well ID: 0114161803030
Loading map...
Location: 03/03-18-011-16W4/0
Location Alias: 03/03-18-11-16 W4M
Location Alias 2: 03/03-18-011-16 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 16
Section: 18
County/Municipality: Municipal District of Taber
Well Name: CNRL HZ 103 TURIN 3-18-11-16
Operator Name: Canadian Natural Resources Limited
License Number: 0445597
License Date: 2012-05-02
License Status: Issued
Spud Date: 2012-06-08
Final Drill Date: 2012-06-14
Well Total Depth: 2219.00 m
Surface Hole Latitude: 49.905896
Surface Hole Longitude: -112.197039

For data sources see[1][2]

Well History

Date Event
2012-05-02 Obtained License
2012-06-10 Direction Drilling Operation Performed - Deviate
2012-06-10 Surface Casing Operation Performed
2012-06-10 Well Log Performed
2012-06-11 Direction Drilling Operation Performed - Horizontal
2012-06-14 Finished Drilling
2012-06-14 Well Mode changed to Drilled and Cased
2012-06-15 Production Casing Operation Performed
2012-06-16 Rig Released
2012-06-18 Well Log Performed
2012-07-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-04 Well Fluid changed to Crude Oil
2012-08-04 Well Mode changed to Potential
2012-09-01 Well Began Production
2012-09-01 Well Fluid changed to Crude Oil
2012-09-01 Well Mode changed to Pumping
2014-06-30 Well Fluid changed to Crude Oil
2014-06-30 Well Mode changed to Suspended
2016-10-19 Perforation Treatment Performed - Jet Perforation
2016-12-01 Well Fluid changed to Crude Oil
2016-12-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-08 Champion Drilling Inc. 350 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-10 740.00 Deviate (5 - 79 degrees)
2012-06-11 1072.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-05 Multi-Stage Fracture 2190.00 2190.10 0
2012-07-05 Multi-Stage Fracture 1509.70 1509.80 0
2012-07-05 Multi-Stage Fracture 1439.00 1439.10 0
2012-07-05 Multi-Stage Fracture 1354.90 1355.00 0
2012-07-05 Multi-Stage Fracture 1285.70 1285.80 0
2012-07-05 Multi-Stage Fracture 1217.20 1217.30 0
2012-07-05 Multi-Stage Fracture 1133.90 1134.00 0
2016-10-19 Perforation 1217.20 1218.20 13
2016-10-19 Perforation 1439.00 1440.00 13
2016-10-19 Perforation 1539.70 1540.70 13
2012-07-05 Multi-Stage Fracture 2105.60 2105.70 0
2012-07-05 Multi-Stage Fracture 2023.00 2023.10 0
2012-07-05 Multi-Stage Fracture 1952.20 1952.30 0
2012-07-05 Multi-Stage Fracture 1883.30 1883.40 0
2012-07-05 Multi-Stage Fracture 1815.00 1815.10 0
2012-07-05 Multi-Stage Fracture 1733.40 1733.50 0
2012-07-05 Multi-Stage Fracture 1664.10 1664.20 0
2012-07-05 Multi-Stage Fracture 1593.70 1593.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3289 0.0 0.0 0.0
2013 4882 0.0 0.0 0.0
2016 444 0.0 0.0 0.0
2017 8225 0.0 0.0 0.0
2018 8021 0.0 0.0 0.0
2019 6511 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-16 No Incident Encountered 0.00 0.00
2012-07-30 No Incident Encountered 0.00 0.00
2017-02-09 No Incident Encountered 0.00 0.00

For data sources see[8]

References