If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114161112020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.897085,"lon":-112.094639,"icon":""}]} |
Location: 02/12-11-011-16W4/0 | |
Location Alias: 02/12-11-11-16 W4M | |
Location Alias 2: 02/12-11-011-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 16 | |
Section: 11 | |
County/Municipality: Municipal District of Taber | |
Well Name: MORRISON ET AL TABERN 12-11-11-16 | |
Operator Name: Devon Canada Corporation | |
License Number: 0070946 | |
License Date: 1978-07-27 | |
License Status: RecCertified | |
Spud Date: 1978-09-18 | |
Final Drill Date: 1978-09-25 | |
Well Total Depth: 980.50 m | |
Surface Hole Latitude: 49.897085 | |
Surface Hole Longitude: -112.094639 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-07-27 | Obtained License |
1978-09-25 | Finished Drilling |
1978-09-25 | Well Mode changed to Drilled and Cased |
1978-09-26 | Drill Stem Test Performed |
1978-09-28 | Production Casing Operation Performed |
1978-10-18 | Perforation Treatment Performed - Jet Perforation |
1978-10-24 | Well Began Production |
1978-10-24 | Well Fluid changed to Crude Oil |
1978-10-24 | Well Mode changed to Flowing |
1978-12-06 | Well Fluid changed to Crude Oil |
1978-12-06 | Well Mode changed to Pumping |
1980-11-17 | Perforation Treatment Performed - Jet Perforation |
1981-02-28 | Perforation Treatment Performed - Fractured |
1981-02-28 | Perforation Treatment Performed - Jet Perforation |
1981-03-12 | Perforation Treatment Performed - Cement Squeeze |
1981-03-12 | Perforation Treatment Performed - Jet Perforation |
1982-04-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-04-18 | Well Abandoned |
1982-04-18 | Well Fluid changed to Crude Oil |
1982-04-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-10-18 | Perforation | 969.80 | 970.80 | 7 |
1978-10-18 | Perforation | 971.40 | 972.80 | 7 |
1978-10-18 | Perforation | 973.80 | 974.80 | 7 |
1980-11-17 | Perforation | 975.40 | 976.40 | 7 |
1981-02-28 | Perforation | 976.50 | 977.50 | 14 |
1981-02-28 | Fracture | 976.50 | 977.50 | 0 |
1981-03-12 | Cement Squeeze | 969.80 | 977.50 | 0 |
1981-03-12 | Perforation | 970.00 | 973.00 | 7 |
1982-04-18 | Packing Device Capped w/Cement | 955.00 | 963.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 1361 | 0.0 | 0.0 | 0.0 |
1979 | 8212 | 0.0 | 0.0 | 0.0 |
1980 | 8753 | 0.0 | 0.0 | 0.0 |
1981 | 6163 | 0.0 | 0.0 | 0.0 |
1982 | 1228 | 0.0 | 0.0 | 0.0 |
For data sources see[5]