X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114161112020

Well Details

Well ID: 0114161112020
Loading map...
Location: 02/12-11-011-16W4/0
Location Alias: 02/12-11-11-16 W4M
Location Alias 2: 02/12-11-011-16 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 16
Section: 11
County/Municipality: Municipal District of Taber
Well Name: MORRISON ET AL TABERN 12-11-11-16
Operator Name: Devon Canada Corporation
License Number: 0070946
License Date: 1978-07-27
License Status: RecCertified
Spud Date: 1978-09-18
Final Drill Date: 1978-09-25
Well Total Depth: 980.50 m
Surface Hole Latitude: 49.897085
Surface Hole Longitude: -112.094639

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-27 Obtained License
1978-09-25 Finished Drilling
1978-09-25 Well Mode changed to Drilled and Cased
1978-09-26 Drill Stem Test Performed
1978-09-28 Production Casing Operation Performed
1978-10-18 Perforation Treatment Performed - Jet Perforation
1978-10-24 Well Began Production
1978-10-24 Well Fluid changed to Crude Oil
1978-10-24 Well Mode changed to Flowing
1978-12-06 Well Fluid changed to Crude Oil
1978-12-06 Well Mode changed to Pumping
1980-11-17 Perforation Treatment Performed - Jet Perforation
1981-02-28 Perforation Treatment Performed - Fractured
1981-02-28 Perforation Treatment Performed - Jet Perforation
1981-03-12 Perforation Treatment Performed - Cement Squeeze
1981-03-12 Perforation Treatment Performed - Jet Perforation
1982-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-04-18 Well Abandoned
1982-04-18 Well Fluid changed to Crude Oil
1982-04-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-18 Perforation 969.80 970.80 7
1978-10-18 Perforation 971.40 972.80 7
1978-10-18 Perforation 973.80 974.80 7
1980-11-17 Perforation 975.40 976.40 7
1981-02-28 Perforation 976.50 977.50 14
1981-02-28 Fracture 976.50 977.50 0
1981-03-12 Cement Squeeze 969.80 977.50 0
1981-03-12 Perforation 970.00 973.00 7
1982-04-18 Packing Device Capped w/Cement 955.00 963.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1361 0.0 0.0 0.0
1979 8212 0.0 0.0 0.0
1980 8753 0.0 0.0 0.0
1981 6163 0.0 0.0 0.0
1982 1228 0.0 0.0 0.0

For data sources see[5]

References