If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114161103002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.888902,"lon":-112.087465,"icon":""}]} |
Location: 00/03-11-011-16W4/2 | |
Location Alias: 00/03-11-11-16 W4M | |
Location Alias 2: 00/03-11-011-16 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 16 | |
Section: 11 | |
County/Municipality: Municipal District of Taber | |
Well Name: SLE TABERN 3-11-11-16 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0088969 | |
License Date: 1981-02-12 | |
License Status: Suspension | |
Spud Date: 1981-03-03 | |
Final Drill Date: 1981-03-10 | |
Well Total Depth: 995.00 m | |
Surface Hole Latitude: 49.888902 | |
Surface Hole Longitude: -112.087465 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-02-12 | Obtained License |
1981-03-10 | Finished Drilling |
1981-03-10 | Well Mode changed to Drilled and Cased |
1981-03-11 | Production Casing Operation Performed |
1981-03-21 | Perforation Treatment Performed - Jet Perforation |
1984-01-12 | Perforation Treatment Performed - Cement Squeeze |
1984-01-14 | Perforation Treatment Performed - Jet Perforation |
1984-11-01 | Perforation Treatment Performed - Casing Vent Production |
1984-11-01 | Well Began Production |
1984-11-01 | Well Fluid changed to Gas |
1984-11-01 | Well Mode changed to Flowing |
1989-01-01 | Well Fluid changed to Gas |
1989-01-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-03-21 | Perforation | 942.50 | 946.50 | 13 |
1984-01-12 | Cement Squeeze | 942.50 | 946.50 | 0 |
1984-01-14 | Perforation | 942.50 | 945.00 | 13 |
1984-11-01 | Casing Vent Production | 303.00 | 303.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1464 | 0.0 | 0.0 | 0.0 |
1985 | 8759 | 0.0 | 0.0 | 0.0 |
1986 | 8015 | 0.0 | 0.0 | 0.0 |
1987 | 8759 | 0.0 | 0.0 | 0.0 |
1988 | 8755 | 0.0 | 0.0 | 0.0 |
For data sources see[5]