X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114142004000

Well Details

Well ID: 0114142004000
Loading map...
Location: 00/04-20-011-14W4/0
Location Alias: 00/04-20-11-14 W4M
Location Alias 2: 00/04-20-011-14 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 14
Section: 20
County/Municipality: Municipal District of Taber
Well Name: HOUSTON GRDFKS 4-20-11-14
Operator Name: Houston Oil & Gas Ltd.
License Number: 0329629
License Date: 2005-04-20
License Status: Abandoned
Spud Date: 2005-05-21
Final Drill Date: 2005-05-26
Well Total Depth: 1161.00 m
Surface Hole Latitude: 49.926266
Surface Hole Longitude: -111.888579

For data sources see[1][2]

Well History

Date Event
2005-04-20 Obtained License
2005-05-22 Direction Drilling Operation Performed - Deviate
2005-05-23 Surface Casing Operation Performed
2005-05-26 Finished Drilling
2005-05-26 Well Mode changed to Drilled and Cased
2005-05-27 Well Log Performed
2005-05-28 Production Casing Operation Performed
2005-05-29 Rig Released
2005-06-27 Perforation Treatment Performed - Jet Perforation
2005-06-27 Well Log Performed
2005-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-29 Plug Back Performed
2005-06-29 Well Mode changed to Abandoned Zone
2005-06-30 Perforation Treatment Performed - Jet Perforation
2005-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-07 Plug Back Performed
2005-07-07 Well Log Performed
2005-07-08 Perforation Treatment Performed - Jet Perforation
2005-07-08 Well Log Performed
2007-09-18 Perforation Treatment Performed - Abrasa-Jet Perforation
2007-09-21 Perforation Treatment Performed - Remedial Casing
2007-09-22 Perforation Treatment Performed - Remedial Casing
2008-07-14 Perforation Treatment Performed - Jet Perforation
2008-07-15 Perforation Treatment Performed - Jet Perforation
2008-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-18 Perforation Treatment Performed - Cement Squeeze
2008-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-19 Perforation Treatment Performed - Cement Squeeze
2008-10-09 Perforation Treatment Performed - Jet Perforation
2008-10-09 Well Log Performed
2008-10-17 Perforation Treatment Performed - Remedial Casing
2008-10-30 Perforation Treatment Performed - Jet Perforation
2008-10-30 Well Log Performed
2008-11-03 Perforation Treatment Performed - Remedial Casing
2008-12-08 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-09 Perforation Treatment Performed - Cement Squeeze
2009-02-04 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-02-04 Well Log Performed
2009-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-05 Perforation Treatment Performed - Remedial Casing
2009-05-20 Perforation Treatment Performed - Jet Perforation
2009-05-20 Well Log Performed
2009-05-21 Perforation Treatment Performed - Cement Plug
2009-05-21 Perforation Treatment Performed - Remedial Casing
2009-05-28 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-05-22 60.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-27 Perforation 1111.00 1114.00 17
2008-07-15 Perforation 1111.00 1114.00 17
2008-07-18 Cement Squeeze 1111.00 1114.00 0
2008-07-18 Packing Device Capped w/Cement 1094.00 1102.00 0
2008-07-19 Cement Squeeze 1040.00 1041.50 0
2008-07-19 Packing Device Capped w/Cement 1022.60 1036.50 0
2008-10-09 Perforation 329.00 332.00 20
2008-10-17 Remedial Casing Cementing 329.00 332.00 0
2008-10-30 Perforation 298.00 299.00 20
2008-11-03 Remedial Casing Cementing 298.00 299.00 0
2008-12-08 Hydra Jet Perforation 397.00 403.00 1
2005-06-29 Packing Device Capped w/Cement 1092.00 1100.00 0
2008-12-09 Cement Squeeze 397.00 403.00 0
2008-12-09 Packing Device Capped w/Cement 392.00 395.00 0
2009-02-04 Hydra Jet Perforation 334.00 340.00 1
2009-02-05 Remedial Casing Cementing 334.00 340.00 0
2009-02-05 Packing Device Capped w/Cement 319.40 328.00 0
2009-05-20 Perforation 291.00 301.00 13
2009-05-21 Remedial Casing Cementing 291.00 301.00 0
2009-05-21 Cement Plug 80.00 318.00 0
2005-06-30 Perforation 1040.00 1041.50 17
2005-07-07 Packing Device Capped w/Cement 1027.00 1035.00 0
2005-07-08 Perforation 185.00 186.00 14
2007-09-18 Hydra Jet Perforation 643.00 648.00 1
2007-09-21 Remedial Casing Cementing 643.00 648.00 0
2007-09-22 Remedial Casing Cementing 185.00 186.00 0
2008-07-14 Perforation 1040.00 1041.50 17

For data sources see[5]



References