If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114132514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.94384,"lon":-111.653809,"icon":""}]} |
Location: 00/14-25-011-13W4/0 | |
Location Alias: 00/14-25-11-13 W4M | |
Location Alias 2: 00/14-25-011-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 13 | |
Section: 25 | |
County/Municipality: Cypress County | |
Well Name: SLE BI 14-25-11-13 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0078064 | |
License Date: 1979-09-17 | |
License Status: Abandoned | |
Spud Date: 1979-09-17 | |
Final Drill Date: 1979-09-21 | |
Well Total Depth: 920.00 m | |
Surface Hole Latitude: 49.943840 | |
Surface Hole Longitude: -111.653809 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-09-17 | Obtained License |
1979-09-21 | Drill Stem Test Performed |
1979-09-21 | Finished Drilling |
1979-09-21 | Well Log Performed |
1979-09-21 | Well Mode changed to Drilled and Cased |
1979-09-22 | Production Casing Operation Performed |
1979-10-10 | Perforation Treatment Performed - Cement Squeeze |
1979-10-10 | Perforation Treatment Performed - Jet Perforation |
1979-10-12 | Perforation Treatment Performed - Jet Perforation |
1979-10-15 | Well Began Production |
1979-10-15 | Well Fluid changed to Crude Oil |
1979-10-15 | Well Mode changed to Flowing |
1983-09-28 | Perforation Treatment Performed - Jet Perforation |
1983-09-28 | Well Log Performed |
1984-07-09 | Well Fluid changed to Crude Oil |
1984-07-09 | Well Mode changed to Pumping |
1992-02-01 | Well Fluid changed to Crude Oil |
1992-02-01 | Well Mode changed to Suspended |
2006-09-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-24 | Perforation Treatment Performed - Jet Perforation |
2006-09-24 | Plug Back Performed |
2006-09-24 | Well Fluid changed to Crude Oil |
2006-09-24 | Well Mode changed to Abandoned Zone |
2006-11-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-11-20 | Plug Back Performed |
2007-05-29 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-10-10 | Perforation | 888.20 | 888.50 | 13 |
1979-10-10 | Cement Squeeze | 888.20 | 888.50 | 0 |
1979-10-12 | Perforation | 880.50 | 882.50 | 13 |
1983-09-28 | Perforation | 878.00 | 882.50 | 13 |
2006-09-24 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
2006-09-24 | Perforation | 621.50 | 623.50 | 20 |
2006-11-20 | Packing Device Capped w/Cement | 600.00 | 608.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 1718 | 0.0 | 0.0 | 0.0 |
1980 | 7775 | 0.0 | 0.0 | 0.0 |
1981 | 7244 | 0.0 | 0.0 | 0.0 |
1982 | 6924 | 0.0 | 0.0 | 0.0 |
1983 | 8425 | 0.0 | 0.0 | 0.0 |
1984 | 8376 | 0.0 | 0.0 | 0.0 |
1985 | 8343 | 0.0 | 0.0 | 0.0 |
1986 | 8472 | 0.0 | 0.0 | 0.0 |
1987 | 8308 | 0.0 | 0.0 | 0.0 |
1988 | 7376 | 0.0 | 0.0 | 0.0 |
1989 | 7742 | 0.0 | 0.0 | 0.0 |
1990 | 8274 | 0.0 | 0.0 | 0.0 |
1991 | 5437 | 0.0 | 0.0 | 0.0 |
For data sources see[5]