If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114132406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.922349,"lon":-111.65647,"icon":""}]} |
Location: 00/06-24-011-13W4/0 | |
Location Alias: 00/06-24-11-13 W4M | |
Location Alias 2: 00/06-24-011-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 13 | |
Section: 24 | |
County/Municipality: Cypress County | |
Well Name: PWEI ET AL BOW ISLAND 6-24-11-13 | |
Operator Name: TAQA North Ltd. | |
License Number: 0132300 | |
License Date: 1988-02-16 | |
License Status: RecCertified | |
Spud Date: 1988-02-18 | |
Final Drill Date: 1988-02-22 | |
Well Total Depth: 972.00 m | |
Surface Hole Latitude: 49.922349 | |
Surface Hole Longitude: -111.656470 |
Date | Event |
---|---|
1988-02-16 | Obtained License |
1988-02-19 | Surface Casing Operation Performed |
1988-02-22 | Finished Drilling |
1988-02-22 | Well Log Performed |
1988-02-22 | Well Mode changed to Drilled and Cased |
1988-02-23 | Production Casing Operation Performed |
1988-02-23 | Rig Released |
1988-02-27 | Perforation Treatment Performed - Jet Perforation |
1988-03-05 | Well Began Production |
1988-03-05 | Well Fluid changed to Crude Oil |
1988-03-05 | Well Mode changed to Pumping |
1993-11-07 | Well Log Performed |
1993-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-11-08 | Perforation Treatment Performed - Jet Perforation |
1993-11-08 | Plug Back Performed |
1993-11-08 | Well Fluid changed to Crude Oil |
1993-11-08 | Well Mode changed to Abandoned Zone |
1993-11-09 | Perforation Treatment Performed - Remedial Casing |
1993-11-11 | Perforation Treatment Performed - Jet Perforation |
1993-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-11-12 | Perforation Treatment Performed - Remedial Casing |
1993-11-12 | Well Abandoned |
1993-11-12 | Well Fluid changed to Crude Oil |
1993-11-12 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-02-27 | Perforation | 929.50 | 930.50 | 13 |
1988-02-27 | Perforation | 931.00 | 932.70 | 13 |
1993-11-08 | Packing Device Capped w/Cement | 907.00 | 915.00 | 0 |
1993-11-08 | Perforation | 210.00 | 211.00 | 13 |
1993-11-09 | Remedial Casing Cementing | 210.00 | 211.00 | 0 |
1993-11-11 | Perforation | 189.00 | 190.00 | 13 |
1993-11-12 | Acid Treatment | 189.00 | 190.00 | 0 |
1993-11-12 | Remedial Casing Cementing | 189.00 | 190.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 5797 | 0.0 | 0.0 | 0.0 |
1989 | 8556 | 0.0 | 0.0 | 0.0 |
1990 | 6893 | 0.0 | 0.0 | 0.0 |
1991 | 6210 | 0.0 | 0.0 | 0.0 |
1992 | 5872 | 0.0 | 0.0 | 0.0 |
For data sources see[5]