X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114131414000

Well Details

Well ID: 0114131414000
Loading map...
Location: 00/14-14-011-13W4/0
Location Alias: 00/14-14-11-13 W4M
Location Alias 2: 00/14-14-011-13 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 13
Section: 14
County/Municipality: Cypress County
Well Name: SLE BI 14-14-11-13
Operator Name: SanLing Energy Ltd.
License Number: 0097039
License Date: 1982-08-16
License Status: Abandoned
Spud Date: 1982-08-16
Final Drill Date: 1982-08-24
Well Total Depth: 898.00 m
Surface Hole Latitude: 49.914003
Surface Hole Longitude: -111.676855

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-08-16 Obtained License
1982-08-24 Finished Drilling
1982-08-24 Well Mode changed to Drilled and Cased
1982-08-25 Drill Stem Test Performed
1982-08-26 Drill Stem Test Performed
1982-08-27 Drill Stem Test Performed
1982-08-28 Production Casing Operation Performed
1982-09-23 Perforation Treatment Performed - Jet Perforation
1982-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-25 Perforation Treatment Performed - Cement Squeeze
1982-09-25 Perforation Treatment Performed - Jet Perforation
1982-10-08 Well Began Production
1982-10-08 Well Fluid changed to Crude Oil
1982-10-08 Well Mode changed to Pumping
1985-11-08 Well Fluid changed to Crude Oil
1985-11-08 Well Mode changed to Suspended
1986-07-01 Well Fluid changed to Crude Oil
1986-07-01 Well Mode changed to Pumping
1986-07-09 Well Fluid changed to Crude Oil
1986-07-09 Well Mode changed to Suspended
2000-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-15 Plug Back Performed
2000-05-15 Well Log Performed
2000-05-16 Well Abandoned
2000-05-16 Well Fluid changed to Crude Oil
2000-05-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-23 Perforation 872.30 873.30 13
1982-09-25 Acid Treatment 872.30 873.30 0
1982-09-25 Cement Squeeze 872.30 873.30 0
1982-09-25 Perforation 867.00 868.50 13
2000-05-15 Packing Device Capped w/Cement 852.00 860.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1956 0.0 0.0 0.0
1983 7608 0.0 0.0 0.0
1984 7373 0.0 0.0 0.0
1985 4034 0.0 0.0 0.0
1986 168 0.0 0.0 0.0

For data sources see[5]

References