If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114131115020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.900921,"lon":-111.673787,"icon":""}]} |
Location: 02/15-11-011-13W4/0 | |
Location Alias: 02/15-11-11-13 W4M | |
Location Alias 2: 02/15-11-011-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 13 | |
Section: 11 | |
County/Municipality: Municipal District of Taber | |
Well Name: PIONEER CANADA 02 GRDFKS 15-11-11-13 | |
Operator Name: TAQA North Ltd. | |
License Number: 0131924 | |
License Date: 1988-02-04 | |
License Status: RecCertified | |
Spud Date: 1988-02-06 | |
Final Drill Date: 1988-02-21 | |
Well Total Depth: 1297.50 m | |
Surface Hole Latitude: 49.900921 | |
Surface Hole Longitude: -111.673787 |
Date | Event |
---|---|
1988-02-04 | Obtained License |
1988-02-07 | Surface Casing Operation Performed |
1988-02-11 | Kick Occurred |
1988-02-12 | Drill Stem Test Performed |
1988-02-21 | Finished Drilling |
1988-02-21 | Well Log Performed |
1988-02-22 | Drill Stem Test Performed |
1988-02-23 | Production Casing Operation Performed |
1988-02-23 | Rig Released |
1988-03-01 | Well Log Performed |
1988-03-03 | Perforation Treatment Performed - Jet Perforation |
1988-03-03 | Well Log Performed |
1988-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-06 | Well Log Performed |
1988-03-07 | Perforation Treatment Performed - Jet Perforation |
1988-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-03-12 | Plug Back Performed |
1988-03-12 | Well Log Performed |
1988-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-03-13 | Plug Back Performed |
1988-03-14 | Perforation Treatment Performed - Jet Perforation |
1988-03-16 | Well Log Performed |
1988-03-17 | Perforation Treatment Performed - Cement Squeeze |
1988-03-19 | Well Log Performed |
1988-03-24 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1988-03-24 | Well Log Performed |
1988-03-26 | Well Log Performed |
1988-03-28 | Well Mode changed to Drilled and Cased |
1988-06-07 | Perforation Treatment Performed - Jet Perforation |
1988-06-07 | Well Log Performed |
1988-06-08 | Perforation Treatment Performed - Remedial Casing |
1988-11-25 | Perforation Treatment Performed - Jet Perforation |
1988-11-25 | Well Log Performed |
1989-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-01-19 | Plug Back Performed |
1989-01-19 | Well Abandoned |
1989-01-19 | Well Log Performed |
1989-01-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-03-03 | Perforation | 1258.00 | 1262.00 | 13 |
1988-06-07 | Perforation | 215.00 | 216.00 | 13 |
1988-06-08 | Remedial Casing Cementing | 215.00 | 216.00 | 0 |
1988-11-25 | Perforation | 893.50 | 895.00 | 13 |
1989-01-19 | Packing Device Capped w/Cement | 880.00 | 888.00 | 0 |
1988-03-04 | Acid Treatment | 1258.00 | 1262.00 | 0 |
1988-03-07 | Perforation | 1239.00 | 1247.50 | 13 |
1988-03-09 | Acid Treatment | 1239.00 | 1247.50 | 0 |
1988-03-12 | Packing Device Capped w/Cement | 1246.00 | 1254.00 | 0 |
1988-03-13 | Packing Device Capped w/Cement | 1226.00 | 1234.00 | 0 |
1988-03-14 | Perforation | 893.50 | 896.50 | 13 |
1988-03-17 | Cement Squeeze | 893.50 | 896.50 | 0 |
1988-03-24 | Hydra Jet Perforation | 894.00 | 894.10 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1988-02-11 | Kick | 907.00 | 907.00 |
For data sources see[5]