X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114123608002

Well Details

Well ID: 0114123608002
Loading map...
Location: 00/08-36-011-12W4/2
Location Alias: 00/08-36-11-12 W4M
Location Alias 2: 00/08-36-011-12 W4/02
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 12
Section: 36
County/Municipality: Cypress County
Well Name: PROVIDENT BI 8-36-11-12
Operator Name: Pembina NGL Corporation
License Number: 0076478
License Date: 1979-06-21
License Status: RecCertified
Spud Date: 1979-07-03
Final Drill Date: 1979-07-06
Well Total Depth: 940.00 m
Surface Hole Latitude: 49.952958
Surface Hole Longitude: -111.510384

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-21 Obtained License
1979-07-05 Kick Occurred
1979-07-06 Finished Drilling
1979-07-06 Well Mode changed to Drilled and Cased
1979-07-07 Drill Stem Test Performed
1979-07-08 Production Casing Operation Performed
1979-07-31 Perforation Treatment Performed - Jet Perforation
1979-11-27 Perforation Treatment Performed - Cement Squeeze
1979-11-28 Perforation Treatment Performed - Jet Perforation
1979-12-07 Perforation Treatment Performed - Jet Perforation
1981-08-08 Perforation Treatment Performed - Jet Perforation
1981-09-15 Well Began Production
1981-09-15 Well Fluid changed to Crude Oil
1981-09-15 Well Mode changed to Pumping
1990-10-31 Well Fluid changed to Crude Oil
1990-10-31 Well Mode changed to Suspended
1995-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-21 Plug Back Performed
1995-10-21 Well Fluid changed to Crude Oil
1995-10-21 Well Mode changed to Abandoned Zone
1995-10-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-31 Perforation 665.50 668.00 13
1979-11-27 Cement Squeeze 665.50 668.00 0
1979-11-28 Perforation 665.50 666.50 12
1979-12-07 Perforation 665.50 668.00 12
1981-08-08 Perforation 919.00 919.30 13
1995-10-21 Packing Device Capped w/Cement 901.60 909.60 0
1995-10-21 Packing Device Capped w/Cement 650.80 658.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 985 0.0 0.0 0.0
1982 6438 0.0 0.0 0.0
1983 6911 0.0 0.0 0.0
1984 5809 0.0 0.0 0.0
1985 4304 0.0 0.0 0.0
1986 650 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-07-05 Kick 715.00 715.00

For data sources see[6]

References