X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114120906000

Well Details

Well ID: 0114120906000
Loading map...
Location: 00/06-09-011-12W4/0
Location Alias: 00/06-09-11-12 W4M
Location Alias 2: 00/06-09-011-12 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 12
Section: 09
County/Municipality: County of Forty Mile No. 8
Well Name: LL&E ET AL BOW ISLAND 6-9-11-12
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0084540
License Date: 1980-07-29
License Status: RecCertified
Spud Date: 1980-08-10
Final Drill Date: 1980-08-13
Well Total Depth: 1000.00 m
Surface Hole Latitude: 49.894414
Surface Hole Longitude: -111.589887

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-29 Obtained License
1980-08-12 Drill Stem Test Performed
1980-08-13 Finished Drilling
1980-08-13 Well Mode changed to Drilled and Cased
1980-08-14 Drill Stem Test Performed
1980-08-14 Well Log Performed
1980-08-15 Drill Stem Test Performed
1980-08-15 Production Casing Operation Performed
1980-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-23 Perforation Treatment Performed - Jet Perforation
1980-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-24 Perforation Treatment Performed - Jet Perforation
1981-01-21 Well Began Production
1981-01-21 Well Fluid changed to Gas
1981-01-21 Well Mode changed to Flowing
1986-04-01 Well Fluid changed to Gas
1986-04-01 Well Mode changed to Suspended
1992-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-12-13 Plug Back Performed
1992-12-13 Well Fluid changed to Gas
1992-12-13 Well Mode changed to Abandoned
1993-05-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-23 Perforation 975.30 978.30 13
1980-09-23 Packing Device Capped w/Cement 957.00 964.00 0
1980-09-23 Perforation 944.00 946.00 13
1980-09-24 Packing Device Capped w/Cement 927.00 935.00 0
1980-09-24 Perforation 687.80 688.80 13
1992-12-13 Packing Device Capped w/Cement 667.00 675.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 6104 0.0 0.0 0.0
1982 4928 0.0 0.0 0.0
1983 1077 0.0 0.0 0.0
1984 1843 0.0 0.0 0.0
1986 168 0.0 0.0 0.0

For data sources see[5]

References