X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114062807000

Well Details

Well ID: 0114062807000
Loading map...
Location: 00/07-28-011-06W4/0
Location Alias: 00/07-28-11-06 W4M
Location Alias 2: 00/07-28-011-06 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 06
Section: 28
County/Municipality: Cypress County
Well Name: PEMBINA MEDHAT 7-28-11-6
Operator Name: City Of Medicine Hat
License Number: 0016369
License Date: 1958-12-12
License Status: Issued
Spud Date: 1958-12-15
Final Drill Date: 1959-01-07
Well Total Depth: 883.60 m
Surface Hole Latitude: 49.936879
Surface Hole Longitude: -110.763768

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-12-12 Obtained License
1958-12-29 Drill Stem Test Performed
1959-01-01 Drill Stem Test Performed
1959-01-07 Finished Drilling
1959-01-08 Drill Stem Test Performed
1959-01-09 Drill Stem Test Performed
1959-01-11 Production Casing Operation Performed
1959-01-18 Perforation Treatment Performed - Bullet Perforation
1959-01-19 Perforation Treatment Performed - Acid Wash - No Pressure
1959-01-24 Perforation Treatment Performed - Bullet Perforation
1959-01-24 Perforation Treatment Performed - Fractured
1959-01-29 Well Mode changed to Drilled and Cased
1959-02-22 Perforation Treatment Performed - Acid Wash - No Pressure
1959-02-22 Perforation Treatment Performed - Fractured
1984-10-10 Well Log Performed
1984-10-11 Perforation Treatment Performed - Jet Perforation
1984-10-29 Perforation Treatment Performed - Acid Wash - No Pressure
1985-05-08 Well Began Production
1985-05-08 Well Fluid changed to Gas
1985-05-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-01-18 Bullet Perforation 324.30 327.40 13
1959-01-19 Acid Wash 324.30 327.40 0
1959-01-24 Bullet Perforation 325.80 326.40 16
1959-01-24 Fracture 324.30 327.40 0
1959-02-22 Acid Wash 324.30 327.40 0
1959-02-22 Fracture 324.30 327.40 0
1984-10-11 Perforation 327.50 330.50 6
1984-10-29 Acid Wash 327.50 330.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2521 0.0 0.0 0.0
1986 3695 0.0 0.0 0.0
1988 4440 0.0 0.0 0.0
1989 4697 0.0 0.0 0.0
1990 2376 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8735 0.0 0.0 0.0
1994 8750 0.0 0.0 0.0
1995 8705 0.0 0.0 0.0
1996 8749 0.0 0.0 0.0
1997 8731 0.0 0.0 0.0
1998 8709 0.0 0.0 0.0
1999 8672 0.0 0.0 0.0
2000 8714 0.0 0.0 0.0
2001 8619 0.0 0.0 0.0
2002 8680 0.0 0.0 0.0
2003 8664 0.0 0.0 0.0
2004 8600 0.0 0.0 0.0
2005 8607 0.0 0.0 0.0
2006 8490 0.0 0.0 0.0
2007 8371 0.0 0.0 0.0
2008 6550 0.0 0.0 0.0
2009 4716 0.0 0.0 0.0
2010 1390 0.0 0.0 0.0
2011 8700 0.0 0.0 0.0
2012 8545 0.0 0.0 0.0
2013 8731 0.0 0.0 0.0
2014 8701 0.0 0.0 0.0
2015 6551 0.0 0.0 0.0
2016 6580 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8584 0.0 0.0 0.0
2019 8634 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[5]

References